Similar Projects
Fire Station 5 Replacement - 828TBD74 - City Of Lees Summit
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Lees Summit, MO 64082

Replace Fire Station 5 - City of Columbia
Renovation
Conception
$3,000,000 CJ est. value
Columbia, MO 65202

Emerson Park Operational Control Center
New Construction - 16,113 SF
Design
$9,900,000 est. value
Saint Louis, MO

Fire Station 4 Replacement - 75735874 - City Of Lees Summit
Demolition, New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Lees Summit, MO 64064

RFP - City of Ozark Planning & Development Tenant Finish
Renovation
Bidding
$345,000 CJ est. value
Ozark, MO 65721

Barry County Jail and Sheriffs Office
New Construction, Infrastructure - 31,431 SF
Sub-Bidding
$5,000,000 CJ est. value
Cassville, MO 65625

Fire Station 13 (FDNS 13)
New Construction
Post-Bid
Springfield, MO 65806

Build the District's Replacement of Fire Station 2
Renovation
Post-Bid
Bates City, MO

Engine House 2 and 3
New Construction
Results
Saint Louis, Wildwood, MO 63005

Police Department Training Center Enclosure
New Construction
Results
MO

Replace Fire Station 4 - City of Columbia
Renovation
Conception
$2,500,000 CJ est. value
Columbia, MO 65202

Morley Street Fire Station / Moberly
New Construction, Infrastructure - 10,000 SF
Design
$1,500,000 CJ est. value
Moberly, MO 65270

New Fire Station
New Construction
Post-Bid
Kennett, MO 63857

Central Cass County Fire Protection District Station 1
Renovation, Addition
Results
Harrisonville, MO 64701

Police Precinct/Municipal Service Center North: Phase 2 - 2246 - City of Columbia
Renovation
Conception
$3,250,000 CJ est. value
Columbia, MO 65201

Last Updated 12/13/2022 05:17 PM
Project Title

Administration Building Foyer Remodel

Physical Address View project details and contacts
City, State (County) Chesterfield, MO 63017   (Saint Louis County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All proposals shall be addressed to the Secretary of the Board of Directors, Monarch Fire Protection District, 13725 Olive Boulevard, Chesterfield, Missouri 63017, and marked "Administration Building Foyer Remodel". Questions on the bid package may be referred to Leo Schwartz at schwartz.l@monarchfpd.org. The bid submittal shall include estimated costs for all design/construction services required to complete an interior remodel package within the existing building shell. The Board of Directors reserves the right to reject any or all bids and to waive any technicalities therein.

Details

17,702 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents