Similar Projects
Theater Stage Lighting
Alteration
Bidding
$170,000 est. value
Florissant, MO

Hubbell LED Troffers Lighting
Post-Bid
Saint Louis, MO

Cold Aerosol ULV Generator
Alteration
Post-Bid
Olivette, MO 63132

Led Light Pole Fixtures
Results
Ballwin, MO

Grand Glaize WWTF Transformer and Gate Replacement
Alteration
Results
Saint Louis, MO

Replacement of Lighting
Alteration
Post-Bid
Florissant, MO 63031

Caulks Creek Pump Station B (P-751) Generator Installation (IR)
Alteration
Results
$174,000 est. value
Chesterfield, MO 63017

JC Penney Building Replace South Electrical Switch Gear
Alteration
Post-Bid
Less than $195,000 est. value
Saint Louis, MO 63121

Clinton Peabody Emergency Lighting Repairs
Alteration
Results
Saint Louis, MO 63104

Rab Lighting, High Bay Light Fixtures
Alteration
Post-Bid
Saint Louis, MO

Generator
Alteration
Results
Sappington, MO 63127

Electrical - On Call Maintenance and Repair Services
Term Contract
Post-Bid
Crestwood, MO

Interior Lighting Replacement at Ferguson Middle School
Alteration
Results
$200,000 est. value
Ferguson, MO 63135

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

Emergency Generators 50 and 80 Replacement
Alteration
Post-Bid
$250,000 est. value
Ferguson, MO 63145

Reported 06/25/2022 12:00 AM
Project Title

RMO22866 Replace and Separate Electrical Services

Physical Address View project details and contacts
City, State (County) Overland, MO   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This procurement is for Small Disadvantaged Businesses (SDB) IDIQ holders in STL for Region 6. A 100% design has been completed for the new electrical utility services for the APC from nearby utility substations, and removal of existing utility feeds and conduits back to the FRC substation switchgear. The new utility services shall be fed from separate utility circuits to maintain existing electrical system redundancy. The construction shall include the modification or replacement of the existing APC electrical service entrance equipment to accept the new utility services. All work must comply with all applicable codes and standards, as well as P100 - Facilities Standards for the Public Buildings Service. Performance under this requirement must have the proper phasing to minimize disruption to the facility and tenant operations

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents