Similar Projects
2022 Street And Utility Improvement Project
Infrastructure
Bidding
Morristown, MN

CSAH 6 Mill, Reclaim, Bit Surfacing, Shoulder Paving and Enhanced Pavement Markings
Post-Bid
Faribault, MN

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Street and Utility Improvement
Results
Lonsdale, MN

2021 Reclamation and Overlay
Results
$3,044,917 est. value
Northfield, MN 55057

Bluff View Street and Utility Improvements
Infrastructure
Post-Bid
Northfield, MN

2021 Street Overlays and Sidewalks
Results
$682,750 est. value
Faribault, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Highway Department Building - Drainage and Pavement Improvements
Results
$232,581 est. value
Faribault, MN 55021

2022 Rice County Aggregate Surfacing
Term Contract, Infrastructure
Post-Bid
Faribault, MN

2021 Street Reconstruction Improvements
Results
$1,205,000 est. value
Faribault, MN

2022 Street Overlay and Sidewalk Improvements
Infrastructure
Post-Bid
Faribault, MN

Wells Township - 175th Street West and 177th Street West
Infrastructure
Results
$225,000 to $300,000 est. value
Faribault, MN 55021

2022 Rice County Bituminous Overlays
Infrastructure
Post-Bid
MN

Robinwood Manor Parking Lot Improvements
Infrastructure
Results
Faribault, MN 55021

Reported 03/18/2022 12:00 AM
Project Title

2022 NW Area Mill and Overlay

Physical Address View project details and contacts
City, State (County) Northfield, MN 55057   (Rice County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bituminous mill and overlay, bituminous trail, concrete curb and gutter, concrete walk, ADA improvements, and storm sewer 2531.503/02315 Concrete Curb & Gutter Design b618 Lf 5,948.00 Thye Parkwayfrom Eveleth Ave W to Lockwood Drive, Lockwood Drive from Thye Pkwy to Gill Ln, Quie Lane from Lockwood Dr to 150 feet west of Rolvaag Ct, Rolvaag Court from Quie Ln to the end of the cul-de-sac, Lupine Drive from Eveleth Ave W to Cannon Valley Dr, Lupine Courtfrom Lupine Dr to the end of the cul-de-sac, Cannon Valley Drivefrom North Ave to 600 feet north of Lupine Dr, Greenleaf Courtfrom Woodland Trail to the end of the cul-de-sac, Wildwood Court from Woodland Trail to the end of the cul-de-sac, Woodland Trailfrom North Ave (curves around) to North Ave, North Avenue from Eveleth Ave W to Zanmiller Dr, Juniper Avenue from Lincoln St to Lincoln Pkwy, Joann Court from Juniper Ave to the end of the cul-de-sac, Headley Court from Dresden Ave to the end of the cul-de-sac, St. Olaf Avenue from Lincoln St to TH-3, and Forest Avenue from Lincoln St to 550 feet east of Madison St 166 Tree Clearing and grubbing 98,118 SY Mill bituminous surface (2.0") 12,320 Ton Type SP 9.5 wearing course mix(3;B) 19,166 SF 4" concrete walk 5,948 LF Concrete curb and gutter desig B618 31,000 LF Striping

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents