Similar Projects
Lander Sidewalk Improvement Project
Infrastructure
Bidding
$300,000 CJ est. value
Lander, WY 82520

Wyoming Department of Environmental Quality (WDEQ) Building, Sidewalk and Parking Lot Reconstruction Project
Infrastructure, Renovation
Bidding
$585,000 CJ est. value
Sheridan, WY 82801

Riverton High School Auditorium
New Construction, Infrastructure - 12,924 SF
Post-Bid
$8,200,000 CJ est. value
Riverton, WY 82501

Pre-Demolition Asbestos Abatement for Dewitt Student Center Building
Term Contract, Infrastructure
Post-Bid
$100,000 CJ est. value
Powell, WY 82435

Shoshoni Town Hall Renovation
Build-out, Renovation
Results
$835,500 CJ est. value
Shoshoni, WY 82649

EMA/CLCPH Archer Storage Facility
New Construction, Infrastructure - 19,507 SF
Results
$3,262,000 CJ est. value
Cheyenne, WY 82007

B5 Expand Room 211
Renovation
Post-Bid
$100,000 CJ est. value
Sheridan, WY 82801

Gillette City Pool Reconstruction
Infrastructure
Results
$5,461,595 CJ est. value
Gillette, WY 82716

Concrete Replacement Project Community Athletic Center
Infrastructure
Post-Bid
$400,000 CJ est. value
Casper, WY 82601

Transit Facility Parking Improvements
Infrastructure
Results
$182,453 CJ est. value
Casper, WY 82601

Campbell County School District Concrete Repairs
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Gillette, WY 82716

District 5 Bridge Rehabilitation
Infrastructure
Results
$2,721,678 CJ est. value
Ethete, WY 82510

District 2 Bridge Rehabilitation
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Kaycee, WY 82639

2023 Pavement Marking Project
Infrastructure
Results
$200,000 CJ est. value
Gillette, WY 82716

Statewide Rumble Strips
Infrastructure
Post-Bid
$400,000 CJ est. value
Bosler, WY 82051

Last Updated 03/11/2023 05:41 AM
Project Title

2023 Basin Streets Chip Seal Project

Physical Address View project details and contacts
City, State (County) Basin, WY 82410   (Big Horn County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $48,134 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For 2023 Basin Streets Chip Seal Project The work under the Bid Schedule for the project includes chip sealing the surface of the following streets: Holdrege Avenue from 250 feet east of 3rd Street west to 9th Street and East "E" Street from the river bridge west to 4th Street Bids shall be submitted on proposal forms provided in accordance with the contract documents. Each bid shall be accompanied by an acceptable bid bond in an amount equal to five (5) percent of the amount of the Proposal payable to the OWNER as a guaranty that if the Proposal is accepted, the Bidder shall execute the Contract and file acceptable Performance and Payment Bonds within thirty (30) days after the award of the Contract. The OWNER reserves the right to reject any or all Proposals and to waive any informality, minor irregularity or technicality in any Proposal in the interest of the OWNER. No bid may be withdrawn within a period of thirty (30) days after the date fixed for the opening of bids. Pursuant to W.S. 16-6-106, "preference is hereby given to materials, supplies, agricultural products, equipment, machinery and provisions produced, manufactured or grown in Wyoming, or supplied by a resident of the state, quality being equal to articles offered by the competitors outside of the state". The funds which have been programmed for the construction of this project are estimated to be sufficient to provide for the proposed work as shown on the plans. In the event contract unit prices indicate a total cost of the project in excess of the funds programmed, the OWNER reserves the right to negotiate with the low bidder to keep the cost of work within the funds allotted to the project. All work shall be in accordance with the Wyoming Public Works Standard Specifications, 2015 Edition, unless otherwise noted. Notice to proceed for this project, should it be awarded, will be issued as soon as all paperwork is completed, and construction must be completed by Friday, June 30, 2023

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents