Similar Projects
Quarterly Preventative Maintenance and Services for Automated Fuel System and Pumps
Infrastructure
Bidding
Suffolk, VA

Area 37 Office Well Replacement
Infrastructure
Bidding
Williamsburg, VA 23188

Furnish and Install 2 Keen 5HP Pumps at State Farm Agribusiness
Post-Bid
Richmond, VA 23225

Cedar Ridge Well Lot
Post-Bid
Roanoke, VA

Open/Clean/Inspection of Wilden Diaphragm Pumps (OEM or Aftermarket Equivalent)
Results
Portsmouth, VA

Self Priming Water Pump
Results
Staunton, VA 24401

JR Recharge Wells (Off Site) (GN016362; C-515663G)
Infrastructure
Bidding
Virginia Beach, VA 23455

Scroll Vacuum Pump
Post-Bid
Norfolk, VA

False Cape State Park Water System and Wash Woods Well Repairs
Results
Virginia Beach, VA 23456

Luray Landing Sewer Pump Station 1
Renovation - 13,050 SF
Bidding
Luray, VA 22835

Pump Maintenance, Repair Services, Parts and Equipment
Post-Bid
Norfolk, VA

Porter Valley Orphan Well Project
Results
$70,000 to $120,000 est. value
Chilhowie, VA

Well Replacement in Gloucester
Infrastructure
Bidding
VA

Construction of Town Center Fountains Pump Replacement
Post-Bid
Virginia Beach, VA

Manhole and Wet Well Rehabilitation and Related Services
Term Contract
Results
VA

Last Updated 03/01/2022 12:40 PM
Project Title

Walton Middle School Waterworks Replacement

Physical Address View project details and contacts
City, State (County) Charlottesville, VA 22903   (Albemarle County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is generally described as an improvement on the existing well water system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents