Similar Projects
Construction of the Offsite Water and Sanitary Facilities to Serve Creekland Village Section 1 and 2
Bidding
TX

Elyson, Section, Thirty Nine Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving
Bidding
TX

Underground Water, Sewer and Storm Utility Product
Post-Bid
Houston, TX 77270

Storm Sewer, Sanitary Sewer and Water Lines to serve Morton Creek Ranch Section 15
Post-Bid
TX

North Regional Storm Water Detention and Amenity Channel Phase 3 to Serve Cane Island
Results
TX

Windfern Road and Spring Brook Village Amenity Center
Results
Houston, TX 77042

Water Distribution, Wastewater Collection and Storm Water Facilities to Serve Villages at Tour 18, Section Three
Bidding
TX

Springwoods Village - CityPlace Roadways Phase III
Post-Bid
TX

HPW FY 2020 Drainage Rehabilitation (Swat) Work Orders 1
Results
Less than $4,000,000 est. value
Houston, TX

Proposed Earth Movement Detention Basin, Offsite Storm Sewer, Water Line Connections and Sanitary Sewer Connections Serving WLY Commerce Park
Bidding
TX

Rehabilitation of Outfall 32
Post-Bid
Hunters Creek Village, TX 77024

Water Distribution, Wastewater Collection, Storm Water Facilities, and Paving to Serve Cane Island, Section Twenty Nine and Pitts Road, Phase Two
Results
TX

Proposed Waterline, Sanitary Sewer, Non-Potable Waterline, Storm Sewer and Paving Improvements on Bridgeland Prairieland Village Section 6
Bidding
TX

I-45 Scarsdale Business Park
Post-Bid
Houston, TX 77002

Detention Basin and Channel Improvement Facilities for Wayside Village West
Results
Less than $4,973,379 est. value
TX

Last Updated 05/13/2020 02:50 PM
Project Title

108-Inch Storm Sewer Outfall Improvements

Physical Address View project details and contacts
City, State (County) TX 77090   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Re-Connect existing outfall pipe at joint with concrete collar and fabricated elbow. Replace existing Timber Bent. Replace Rip Rap on side slopes as needed. Sedimentation Build Up in front of outfall needs to be removed. No riprap shall be placed below the ordinary high water mark. A ROW Permit From HCFCD needs to be obtained prior to construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents