Similar Projects
Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Girl Scouts STEM Center for Excellence / Peninsula
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Peninsula, OH 44264

Goddard School Addition / Macedonia
Addition, Infrastructure - 3,535 SF
Design
$700,000 CJ est. value
Macedonia, OH 44056

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

White Pond Road Resurfacing (CH 317)
Infrastructure
Results
$1,228,618 est. value
OH

Concrete Maintenance and Repair 2022
Infrastructure, Alteration
Results
$246,000 est. value
Tallmadge, OH

White Pond Drive Mixed Use
New Construction, Infrastructure - 51,720 SF
Pending Verification
$55,000,000 CJ est. value
Akron, OH 44313

Sgt Clean Car Wash / Fairlawn
Demolition, New Construction, Infrastructure - 5,600 SF
Pending Verification
$5,000,000 CJ est. value
Fairlawn, OH 44333

Akron Zoo - State of Ohio
Infrastructure
Conception
Akron, OH 44307

Roadway Minor Rehab - IR 77
Infrastructure
Design
$2,080,000 CJ est. value
Akron, OH 44320

Ravenna Road Resurfacing Part 1
Infrastructure
Post-Bid
$956,257 est. value
Akron, OH

2022 Smugglers Cove Reconstruction
Infrastructure
Results
$1,177,407 est. value
Reminderville, OH

Wallhouse Inn
New Construction, Infrastructure - 66,870 SF
Pending Verification
$10,000,000 CJ est. value
Hudson, OH 44236

Last Updated 08/22/2023 06:06 AM
Project Title

Four Lane Resurfacing - SR 59

Physical Address View project details and contacts
City, State (County) Cuyahoga Falls, OH 44221   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $3,336,900 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The surface tolerance specification requirements are modified to use the International Roughness Index (IRI) as follows for all pavements of constant width with at least 1 centerline mile (1.6 km) of continuous paving. Short breaks in paving such as bridge decks, intersections, etc. are not considered breaks in continuous paving. Also included is pavement for ramps, including acceleration lanes and deceleration lanes, where the total length is greater than 0.5 miles (0.8 km); and all interstateto-interstate ramps including acceleration lanes and deceleration lanes, regardless of total length. For roads with less than 1 centerline mile (1.6 km) of paving; ramps, acceleration lanes, and deceleration lanes not included above; and sections of undivided highways, as defined in this note, within corporation limits with posted speed limits less than 40 miles per hour, smoothness measurement and corrective action for all areas of localized roughness with an IRI in excess of 250 inches per mile (3.95 m/km) in 25 feet (7.6 m) is required. For these same areas, no corrective action for 0.1-mile (0.16 km) sections having an MRI (lot roughness) greater than 90 inches per mile (1.42 m/km) is required and no pay adjustments will be made. OHDOT - Four Lane Resurfacing - SR 59

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents