Similar Projects
RFP - Eastern Sierra Airborne Electromagnetic Survey
Term Contract
Bidding
Los Angeles, CA 90012

RFP - Park Condition Assessment
Term Contract
Bidding
Santa Monica, CA 90401

Facility Investment Services
Term Contract
Post-Bid
Bell, CA 90201

Water Well Casing Inspection, Aquifer Flow Testing, and Water Quality Profiling at Lynwood Wells 5, 19, 21, And 22
Infrastructure
Post-Bid
$375,000 est. value
Lynwood, CA 90262

Perris Valley Pipeline Interstate 215 Crossing Construction Management Services
Infrastructure
Results
Los Angeles, CA 90012

RFP - Professional, Technical, and Engineering Consulting Services
Term Contract
Bidding
Los Angeles, CA 90012

A and E On Call Roadway Construction Inspection Services
Infrastructure
Post-Bid
$4,800,000 to $780,000 est. value
CA

RFP - Balboa Sports Complex Aquatic Facility (Task A) and Mar Vista Pool and Bathhouse Replacement Project (Task B)
Term Contract
Bidding
Los Angeles, CA 91316

AE On Call Quality Assurance and Source Inspection Services
Infrastructure
Post-Bid
$14,400,000 to $23,400,000 est. value

RFQ - Provide Stormwater Alternative Analysis Feasibility Study Services
Term Contract
Bidding
Long Beach, CA 90802

Manhole Inspection Program II
Term Contract
Post-Bid

RFQ Design - OEPM Parkwide Surveillance System
Term Contract
Bidding
$5,396,300 CJ est. value
Los Angeles, CA 90012

On-Call Consulting Civil Engineering, Construction Management, Traffic Engineering, Construction Inspection
Term Contract
Post-Bid
La Mirada, CA

RFP - Park Master Plan Development
Term Contract
Bidding
Hermosa Beach, CA 90254

CM & Inspection Services
Term Contract
Post-Bid
Huntington Park, CA

Last Updated 09/26/2022 04:04 AM
Project Title

RFP - Santa Monica Groundwater Sustainability Plan Implementation

Physical Address View project details and contacts
City, State (County) Santa Monica, CA 90401   (Los Angeles County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Santa Monica Subbasin Groundwater Sustainability Plan (GSP) was developed in accordance with the Sustainable Groundwater Management Act (SGMA), adopted by the Santa Monica Basin Groundwater Sustainability Agency (SMBGSA) on January 13, 2022, and submitted to the California Department of Water Resources (DWR) on January 27, 2022. While DWR reviews and evaluates the GSP, the SMBGSA will implement it, including filling data gaps, groundwater modeling support, seeking funding for projects to maintain the sustainable use of groundwater in the Santa Monica Subbasin (Subbasin), continuing stakeholder engagement efforts, and preparing annual reports documenting current groundwater conditions and implementation progress for review by DWR. The purpose of the scope of work is to provide technical, website, and public meeting support to the SMBGSA to support the ongoing proactive sustainable management of groundwater in the Subbasin. Question Submission Deadline:September 30, 2022, 3:00pm Question Response Deadline:October 14, 2022, 5:00pm The general scope of services consists of seven tasks detailed below. These tasks involve data analysis, numerical groundwater modeling, SMBGSA meeting support, SMBGSA website support, and report writing. This scope requires expert knowledge of the requirements of, and any amendments to, SGMA. Additionally, experience preparing GSPs and annual reports and familiarity with the information contained in the Santa Monica Subbasin GSP and the 2022 Annual Report will be required to successfully complete the scope of work below, and assist the SMBGSA with meeting the ongoing regulatory requirements of SGMA. The task descriptions below reference the work to be done by the selected consulting firm or team. The City of Santa Monica and the SMBGSA will require on-going, as needed, hydrogeologic support for implementation of the GSP and sustainable management of the Santa Monica Subbasin. Under this task the selected consultant will assist the SMBGSA with data analysis, review and synthesis of current and historical technical reports, evaluation of groundwater conditions, and assessment of progress toward GSP implementation. The method of contractor selection has not been determined at this time.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents