Similar Projects
Governor's Hill Townhomes
New Construction
Design
Bedford, VA 24523

Leesville Road Apartment Complex
New Construction
Design
Forest, VA

Bell Town Road Water Line Extension
Infrastructure
Bidding
$450,000 CJ est. value
Bedford, VA 24523

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Conventional Onsite Sewage System Installation Project
Infrastructure
Results
$18,800 CJ est. value
Forest, VA 24551

Westyn Phase 2 Residences
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Forest, VA 24551

12th Street Apartments
Renovation
Pending Verification
Lynchburg, VA

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23464

Onsite Sewage System Installation Project With LGMI
Infrastructure
Results
$28,400 CJ est. value
Forest, VA 24551

Express Car Wash / Forest
New Construction, Infrastructure - 3,500 SF
Post-Bid
$1,000,000 CJ est. value
Forest, VA 24551

Town and County Sewer Replacement
Infrastructure
Post-Bid
$2,600,000 CJ est. value
Bedford, VA 24523

RFP D/B - Rehabilitate Sections of Blue Ridge Parkway in Virginia Blue Ridge Parkway
Infrastructure
Post-Bid
$65,000,000 CJ est. value
Bedford, VA 24523

Dollar Tree - Smith Mountain Lake / Hardy
New Construction, Infrastructure - 9,977 SF
Post-Bid
$2,600,000 CJ est. value
Moneta, VA 24121

Last Updated 03/07/2023 01:13 PM
Project Title

Corporate Park Drive Townhomes

Physical Address View project details and contacts
City, State (County) Forest, VA 24551   (Bedford County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 2023, the Special Use Permit has been approved by Bedford County. Information regarding contractor has yet to be confirmed. Although a firm timeline has yet to be announced, construction is estimated to begin Spring 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents