Similar Projects
Restore Shoreline
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Canaveral As, FL

Gate Valves
Post-Bid
Palm Bay, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

General Contractor - Utility Systems
Term Contract
Results
Cocoa, FL 32922

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

South Carpenter Water Main Extension
Results
Less than $517,000 est. value
Titusville, FL 32780

Construct Utilities Flight Control Rd, CCSFS, FL
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL 32920

Prequalification of Companies to Bid Construction Services for the Pineda Causeway Water Transmission Mains Project
Results
Melbourne, FL 32901

Cip - 6 Inch Valve Replacement
Infrastructure
Post-Bid
Palm Bay, FL

Malabar Road Drainage Pipe Repairs
Results
Less than $500,000 est. value
Palm Bay, FL 32907

Pipe Connection To Fire Station Pond
Results
$365,878 est. value
Palm Bay, FL 32905

Ocean Boulevard Water Main
Results
Melbourne, FL 32901

Culvert Pipe Replacement Unit 20
Results
Less than $318,920 est. value
Palm Bay, FL 32907

Drainage Outfall Repair
Results
Less than $250,000 est. value
FL

Reported 03/25/2022 12:00 AM
Project Title

Melbourne Estates/Henry Ave Water Main/ Drainage Project

Physical Address View project details and contacts
City, State (County) West Melbourne, FL   (Brevard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Melbourne Estates / Henry Avenue Water Main Replacement Project involves the replacement of approximately 8,000 linear feet (LF) of potable water mains and connections/replacement of approximately 92 potable water service lines within the public Right-of-Way (ROW) of the Melbourne Estates neighborhood, Henry Avenue, and Lake Court, and all other items and work specified.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents