Similar Projects
IDIQ Express Menu Small Project Construction Services - Western Oklahoma
New Construction
Design

Utilities - US 60
Infrastructure
Design
$500,000 CJ est. value
Enid, OK 73701

700-1600 Blocks East Oklahoma Avenue Waterline Relocation
Infrastructure
Bidding
$400,000 CJ est. value
Enid, OK 73701

Garber Schools - New Field House & Cafeteria Improvements
New Construction, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Garber, OK 73738

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Renovate Officer Unaccompanied Housing F645
Renovation
Results
$1,000,000 to $5,000,000 est. value
Enid, OK

Construct Allied Support For Temporary Fire Station Bunk Rooms
New Construction
Results
Enid, OK 73701

Resurface - US 64
Infrastructure
Design
$7,000,000 CJ est. value
Garber, OK 73738

Renovate Aircraft Maintenance Backshops for Decontamination Room B128
Renovation
Post-Bid
$250,000 to $500,000 est. value
Enid, OK

Resurface (Asphalt) - US-64/US-412
Infrastructure
Results
$10,846,079 CJ est. value
Enid, OK 73701

Pacer Softball Fieldhouse
Demolition, New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Enid, OK 73703

Coating and Painting of Water Storage Tanks for Water District 5
Infrastructure
Results
$107,000 CJ est. value
Enid, OK 73701

Red Carpet Brick on Main Apron, F7001
Renovation
Post-Bid
$100,000 CJ est. value
Enid, OK 73703

Pavement Rehabilitation (Asphalt) - SH-74
Infrastructure
Results
$1,343,870 CJ est. value
Garber, OK 73738

Last Updated 03/31/2023 05:05 AM
Project Title

Remove Underground Fuel Tank F197

Physical Address View project details and contacts
City, State (County) Enid, OK 73703   (Garfield County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Magnitude: Between $0 and $100,000All offers are subject to the (1) work requirement, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. D. Offers providing less than 90 calendar days for AFFS Federal Field Services acceptance after the date offers are due will not be considered and will be rejected. E. Offeror agrees to furnish any required payment and performance bonds within ten (10) calendar days after notification of acceptance of this offer or as otherwise specified. Notification may be either verbal or written. F. By signature on the reverse (Block 14B), the offeror affirms the completeness and accuracy of the entire offer, including the Representations and Certifications, as of the date of that signature (Block 14C). The offeror shall immediately notify Local Purchase in the event of any changes. The Subcontractor shall begin performance within forty-five (45) calendar days and complete it within 30 calendar days after receiving [ ] award, [ X ] Notice to Proceed. The Subcontractor is advised that any required payment and performance bonds must be promptly executed and returned to the contracting officer 9. CONFERENCE MEETING INFORMATION AND ADDITIONAL NOTES (IF ANY) A Pre-Bid conference and site visit will be conducted on 9 March 23_ (date) at _2:00 P.M. Central Time. (hour) local time, at Building 200 Conference Room 123, 400 Young Road, Vance AFB. It is recommended that the Contractor visit the site of work at this time. Failure to do so shall not be basis for claim against AFFS due to lack of knowledge of existing conditions after any contract award. Please notify Jennifer Bolz if attending by email. We will accept questions on this project until 3/16/23 at 3:00PM CST by email. AFFS Field Services will not make payment for materials delivered to the job site in advance of their incorporation into the project. 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION (SEP 2000) (See AFFS Federal Field Services Supplement PG 5 ) (a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of: $267.00 per calendar days until completed and accepted. (b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. Please notify Jennifer Bolz if attending by email. We will accept questions on this project until 3/16/23 at 3:00PM CST by email. All work must be in compliance with TITLE 165. CORPORATION COMMISSION CHAPTER 25. UNDERGROUND STORAGE TANKS. Part 13. Removal and Closure of Underground Storage Tank (UST) Systems 165:25-2-131 Tank Removal and Closure. a. Contractor must be a licensed UST remover and must be on the job site at all times during removal. Any underground storage tank system permanent removal requires at least a fourteen-day (14) notification, prior to the removal activity, by submitting the OCC Petroleum Storage Tank Division (PSTD) a scheduling form; and receiving confirmation of the scheduled removal from the PSTD. b. The tank must be completely emptied before removal. c. Piping must be removed and capped at the building. If removal of piping is not possible, contact AFFS Construction Manager for further guidance.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents