Similar Projects
Asphalt Chip Seal Coating
Infrastructure
Post-Bid
Medford, WI 54451

Chip Sealing
Post-Bid
Rib Lake, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street and Utility Improvements
Results
$200,000 to $900,000 est. value
Medford, WI

Milling and Paving
Infrastructure
Post-Bid
Medford, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Culvert Pipes
Infrastructure
Post-Bid
WI

Stratford - Goodrich, South County Line to STH 64
Infrastructure
Results
Goodrich, Stratford, WI

Milling
Infrastructure
Post-Bid
WI

McComb Avenue and Landall Avenue Reconstruction
Infrastructure
Results
Rib Lake, WI 54470

Crackfilling
Infrastructure
Post-Bid
WI

2022 Street and Utility Improvements - Perkins Street
Infrastructure
Results
$900,000 est. value
Medford, WI 54451

Pulverizing
Infrastructure
Post-Bid
WI

2022 Street and Utility Improvements - Peps Drive Residential
Infrastructure
Results
$500,000 est. value
Medford, WI

Black Top
Infrastructure
Post-Bid
$400,000 est. value
Sheldon, WI 54766

Last Updated 07/12/2022 09:12 AM
Project Title

Gilman - Medford, CTH B to STH 73 S

Physical Address View project details and contacts
City, State (County) WI   (Taylor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 1,140 CY; Borrow, 254 CY; Base Aggregate Dense, 1,584 Ton; Marking Epoxy, 86,016 LF; Construction Staking, 191 LF; Construction Staking, 3 Each; Construction Staking, 1 LS; Culvert Pipe, 62 LF 48”, 52 LF 54“; Concrete Curb and Gutter, 91 LF; Concrete Sidewalk, 535 SF; Beam Guard, 1,952 LF; Asphaltic Surface, 290 Ton; HMA Pavement, 12,420 Ton; Removing Asphaltic Surface Milling, 80,580 SY; Tack Coat, 9,690 Gals; Signs, 28 SF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents