Project Title | Construction of the Bynum Leatherwood Road Water Transmission Main |
Physical Address | View project details and contacts |
City, State (County) | Anniston, AL 36201 (Calhoun County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $430,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A summary of the work items is included below: The work includes the installation of approximately 1,200 linear feet of 8-inch diameter water transmission main. All pipe will be Ductile Iron Pipe (DIP). The contract to be bid will include restrained joint fittings, isolation valves, bored roadway crossings, and connections to existing system. The work of constructing the project will be let under one Contract if an award should be made; and the Owner reserves the right to select the Bid considered by the Owner to be in the best interest of the Owner. A cashier's check or bid bond payable to Anniston Water Works and Sewer Board, in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. A summary of the work items is included below: The work includes the installation of approximately 1,200 linear feet of 8-inch diameter water transmission main. All pipe will be Ductile Iron Pipe (DIP). The contract to be bid will include restrained joint fittings, isolation valves, bored roadway crossings, and connections to existing system. The work of constructing the project will be let under one Contract if an award should be made; and the Owner reserves the right to select the Bid considered by the Owner to be in the best interest of the Owner. A cashier's check or bid bond payable to Anniston Water Works and Sewer Board, in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. achieve Substantial Completion of the Contract within one hundred eighty (180) consecutive calendar days following the Notice to Proceed, and will achieve Final Completion of the Contract within two hundred forty (240) consecutive calendar days following the Notice to Proceed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||