Similar Projects
Platteville High School Improvements
Renovation - 13,500 SF
Conception
Platteville, WI 53818

Maple Road Proposed Subdivision
New Construction
Design
Jackson, WI 53037

Saint Ambrose Academy
New Construction, Addition - 44,582 SF
Design
Fitchburg, WI 53711

Small Electric Motor Equipment Repair
Renovation
Sub-Bidding
$100,000 CJ est. value
Milwaukee, WI 53202

Snow Plow
Term Contract
Sub-Bidding
Hayward, WI 54843

Bay View High School - Exit Sign Upgrades
Renovation
Post-Bid
Milwaukee, WI 53207

Spooner Elementary, High School & Middle School
Addition
Post-Bid
Spooner, WI 54801

Casimir Pulaski High School - Div 1-Autobody Shop
Renovation
Results
Milwaukee, WI 53215

Harold S Vincent High School - DIV 2-Barn Infrastructure Upgrades
Renovation
Results
Milwaukee, WI 53224

High School Additions and Renovation Bid Package 2
Renovation, Addition
Construction
Clinton, WI

Wisconsin School Of The Deaf - Elevator Addition
Renovation
Construction
Delavan, WI 53115

New Middle School Option 2 / Waunakee Community School District
New Construction
Design
$10,000,000 est. value
Waunakee, WI

Columbus High School
Renovation, Addition
Post-Bid
Columbus, WI 53925

Slinger High School Interior Toilet Alterations
Renovation - 1,700 SF
Results
Slinger, WI 53086

Lourdes Academy
Renovation, Addition - 27,211 SF
Construction
Oshkosh, WI 54902

Last Updated 07/22/2022 10:32 AM
Project Title

Wayland Academy Residence Hall Renovation

Physical Address View project details and contacts
City, State (County) Beaver Dam, WI 53916   (Dodge County)
Category(s) Education, Residential
Sub-Category(s) Dormitory, Middle/Senior High School
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: a total rebuilding of the interior, creating student and faculty housing which provides a shared private bathroom and shower located between two bedroom suites on a 4-story above grade Dormitory and educational facility. As of July 22, 2022, an architect and general contractor have been selected for this project, but a firm construction timeline has not yet been released.

Details

4 Stories Above Grade, 30,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents