Similar Projects
Provide Wastewater Treatment Plant Improvements, Building 92 - Plumbing
Alteration
Bidding
$100,000 to $250,000 est. value
Bedford Hills, NY 10507

Plumbing Services
Term Contract
Bidding
NY

On-Call Plumbing Services
Term Contract
Post-Bid
Buffalo, NY 14202

District Wide Remediation Plumbing
Post-Bid
NY

Red Wing Bathhouse Plumbing
Results
Hopewell Junction, NY 12533

Plumbing Repair Services
Term Contract
Results
Mount Vernon, NY 10553

Plumbing Contractors
Alteration
Bidding
Troy, NY

Court Hall Domestic Hot Water Replacement
Post-Bid
Ithaca, NY

Furnish PVC Pipe and Fittings
Term Contract
Results
Syracuse, NY 13202

Pavilion CSD - 2021-22 Capital Outlay Exception Project
Alteration
Bidding
$100,000 est. value
Pavilion, NY 14525

Plumbing Contract Services
Term Contract
Post-Bid
Tarrytown, NY 10591

Various Mechanical and Plumbing Term Services
Term Contract
Results
Canandaigua, NY 14424

Water Treatment Plant HVAC and Plumbing Relocation
Alteration
Bidding
Niagara Falls, NY

PVC Pipe and Fittings
Term Contract
Post-Bid
Syracuse, NY 13202

Job Order Contracting Services for Region 1 - Plumbing
Results

Last Updated 12/28/2021 03:56 PM
Project Title

Rehabilitate Armory and Storage Building - Plumbing Work

Physical Address View project details and contacts
City, State (County) Bronx, NY 10468   (Bronx County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Thoroughly clean pipe and tubing prior to installation. During installation, prevent foreign matter from entering systems. Prevent if possible and remove stoppages or obstructions from piping and systems. PRESSURE TESTS - PIPING . Piping shall be tight under test and shall not show loss in pressure or visible leaks, during test operations or after the minimum duration of time as specified. Remove piping which is not tight under test; remake joints and repeat test until no leaks occur. Water Systems Domestic water (potable cold, domestic hot and recirculation) inside buildings Before fixtures, faucets, trim and accessories are connected, perform hydrostatic test at 125 psig minimum for 4 hours. b. After fixtures, faucets, trim and accessories are connected, perform hydrostatic retest at 75 psig for 4 hours.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents