Similar Projects
Reported | 06/11/2022 12:00 AM |
Project Title | Construction Manager - The Ruth and Nathan Hale Theater - A New Performing Arts Facility |
Physical Address | View project details and contacts |
City, State (County) | Pleasant Grove, UT 84062 (Utah County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Theaters/Auditoriums |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $29,000,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project will include the following: Main Theater large auditorium with 680+ seats stage with large proscenium thrust full trap miscellaneous storage for properties, risers, sound, tool, lights, dressing, off stage restrooms and wardrobe greenroom and miscellaneous cast support spaces tension wire grid, technical galleries, and control rooms Studio Theater flexible space multi-configurable 250+ studio theater full trap miscellaneous storage spaces for properties, risers, sound, tool, lights, dressing, off stage restrooms and wardrobe greenroom and miscellaneous cast support spaces tension grid and control room Patron Amenities lobby concessions ticketing coat check, front of house manager, and support spaces Ballroom and VIP lounge rooms and support spaces Education Center recording studio recital studio multi-function studios vocal studios administrative and support Foundation, Theater, and Performing Arts Education Administrative offices reception conference rooms storage and support CM/GC Work Phases The CM/GC work for the project consists of two (2) phases: Pre-construction and Construction. 1. Pre-construction Phase: This phase of the work includes, but is not limited to, estimating and cost control, schedule development, drawing and constructability reviews. The CM/GC shall provide a full construction estimate at the Schematic Design, Design Development and 90% Construction Document phases of the project. The CM/GC shall furthermore assist the Owner and Design Consultant in maintaining the cost of construction within the Fixed Limit of Construction Cost (FLCC) and the duration of the construction within the project's schedule. 2. Construction Phase: This phase of the work consists of the CM/GC furnishing and installing all work as required in the Contract Documents. Please note that the work of the Construction Phase may be bid in several packages, such as excavation, footings and foundations, structural steel, etc |
||||||||||||||||||||||||||||||||||||||
Details | Theaters/Auditoriums, 62,000 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |