Similar Projects
Mayo Clinic Health Systems Expansion
Addition
Conception
Mankato, MN 56001

Mayo Clinic Hospital Renovation / Albert Lea
Renovation
Design
$15,000,000 CJ est. value
Albert Lea, MN 56007

Domestic Water Piping Replacement at RTC Brainerd Building 20 and 22
Renovation
Bidding
$509,995 CJ est. value
Brainerd, MN 56401

Fergus Falls Regional Treatment Center Phase 3 Exterior Stabilization Project
Renovation, Infrastructure
Bidding
$1,400,000 CJ est. value
Fergus Falls, MN 56537

Area 9 Battalion Headquarters Transient Training Building
New Construction
Post-Bid
$1,500,000 est. value
Little Falls, MN

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Centralized Services & Social Distancing COVID Design-Build
Results
Minneapolis, MN 55417

Renovate Mh Ward 1L, 1H and 1K - Minneapolis VAMC
Renovation
Results
$10,000,000 to $20,000,000 est. value
Minneapolis, MN 55417

Large Motor Activity Space
Addition, Infrastructure - 4,000 SF
Construction
Willmar, MN 56201

Maple Grove Hospital Expansion
Addition
Pending Verification
$191,000,000 est. value
Maple Grove, MN 55369

Emergency Department
Renovation - 3,300 SF
Post-Bid
Windom, MN 56101

Public Health Clinic Selective Remodeling
Results
$250,000 est. value
Apple Valley, West Saint Paul, MN 55118

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 4,850 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

Area 5 Battalion Headquarters
New Construction - 7,100 SF
Results
Little Falls, MN

Joint Reserve Intelligence Center
Addition
Post-Bid
Minneapolis, MN

Last Updated 09/29/2022 05:32 AM
Project Title

EHRM Infrastructure Upgrades Construction Minneapolis

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55417   (Hennepin County)
Category(s) Government/Public, Medical
Sub-Category(s) Hospital, Military Facility
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $46,376,114 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Sep 27, 2022 Contract Award Number: 36C77622C0144 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: QST7A5N63TL4 Contractor Awarded Name: RICHARD GROUP LLC Contractor Awarded Address: GLENVIEW, IL 60026 Base and All Options Value (Total Contract Value): $46376114.00000000 Project no: 618-21-700 This project is the construction and commissioning of the infrastructure needed for the nationally mandated Electronic Health Record Modernization (EHRM) project at the Sioux Falls VAMC. Construction and commissioning will be in accordance with the A/E provided final drawing set and associated specifications. The project is widely spread throughout the hospital, touching several different departments and service areas. A new server room is to be built on the roof, between the north wing of building 5 and the newly built lab. This project will have limited on-site storage for material so off-site storage of material should be planned for. This project has multiple phases for structural/civil work which are critical at the very beginning of the project and will require coordination with the COR. The majority of the work will likely need to be done on "off" hours and weekends. ADMINISTRATIVE: The solicitation will be issued as a Request For Proposal (RFP} conducted in accordance with FAR Parts 15, 19, and 36 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation is advertised as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Offers received from other than SDVOSB concerns will not be considered. The applicable NAICS code is 236220 with a size standard of $39.5 million. The period of performance is approximately 450 calendar days from the issuance of the Notice to Proceed. The Magnitude of Construction is expected to be between $20,000,000.00 and $50,000,000.00 (Note that the VMR magnitude of construction is closer to the lower end of this range). All questions must be submitted in writing to the issuing office via email to Jason.Schultz@va.gov. Telephone calls will not be accepted. TECHNICAL QUESTIONS: Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Jason Schultz. Questions shall be submitted only via e-mail to: jason.schultz@va.gov. The subject line must read: Minneapolis EHRM Infrastructure Upgrades - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS June 14, 2022 at 4:00 PM ET. The VA recognizes that this is a large project and there may be technical questions submitted after deadline, but the VA does not guarantee that late questions will be answered. Please submit questions as soon as possible, to ensure the most accurate answers from the VA. **If possible, the prime GCs should try to submit all the questions from their team. This will prevent unnecessary duplicate questions. 2.5 PRE-PROPOSAL SITE VISIT: See FAR 52.236-7 for information regarding the site visit. Please RSVP to Jason.schultz@va.gov by June 3, 2022, with the names of who is attending from your firm. This will help the VA better coordinate for the site visit, as the room capacity is limited. NOTE: Contractor shall be responsible for attending the Pre-Proposal Site Visit prior to submissions in order to verify all existing conditions and take any necessary measurements required to adequately propose on the project. If the Contractor chooses not to attend the Pre-Proposal Site Visit, the Contractor may submit their proposal at their own risk. 2.6 AMENDMENTS: Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable. 2.7 PREPARATION OF PROPOSALS: The Government will not pay for any costs incurred in preparation and submission of proposals. 2.8 PROPOSAL REQUIREMENTS: A. General: 1. Proposal Submission: Offerors shall submit their proposals via email to jason.schultz@va.gov. Proposals shall be based on solicitation document issued for RFP number 36C77622R0045. Proposals will be in the format stipulated in this document. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442. There will be no public opening of the proposals. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted. B. Proposal Format: 1. Technical, Price and Administrative sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in three (3) Volumes: Volume I Technical, Volume II Price and Volume III Administrative. In order that the Volume I Technical may be evaluated strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I. Offeror shall separate Volumes I, II and III. Each volume must be labeled with the Offeror's organization, business address, and VA Solicitation Number. The volumes shall be submitted in electronic format as searchable PDF documents. The proposal, in its entirety, shall not exceed three (3) emails (one email for each volume) of 5MB each. Include page numbers and the company name in the header or footer of each page. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers, Flagpoles.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Casework, Furniture, Office Furniture, Seating, Institutional Furniture, Healthcare Furniture, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents