Similar Projects
Asphalt Mill and Overlay
Post-Bid
Edgerton, WI

2021 Paving South Creek Road from Shopiere Road to East West Hart Road
Infrastructure
Post-Bid
Beloit, WI 53511

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Beloit - Evansville, Br. Allen Creek, B-53-0293, Monroe - Evansville, STH 213 - Garrison Drive
Results
Beloit, Evansville, Monroe, WI 53536

Asphalt Milling/Pulverizing
Infrastructure
Post-Bid
WI

Street Rehabilitation
Results
$4,485,000 est. value
Janesville, WI

Paving East Stateline Road from Dry Creek East to Freechurch Road
Infrastructure
Post-Bid
$300,000 est. value
WI

South Main Street Rehabilitation And East Racine Street Safety Conversion
Results
$1,500,000 est. value
Janesville, WI 53545

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Crack Filling and Chip Sealing Services
Results
Edgerton, WI 53534

Asphalt Milling/Pulverizing
Results
Janesville, WI

Airport Surfacing
Results
Brookfield, Janesville, Lancaster, Tomah, Waukesha, Wausau, Woodruff, WI 53072

Tolles Road Reconditioning
Results
WI 53536

Chip Sealing
Results
Less than $140,000 est. value
Janesville, WI

Chip Sealing
Results
$140,000 est. value
Janesville, WI

Reported 07/13/2022 04:11 PM
Project Title

USH 14 - Re/Reconditioning / Mill and Overlay

Physical Address View project details and contacts
City, State (County) Evansville, WI 53536   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Evansville, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. USH 14 CTH K to Illinois St Line Re/Reconditioning / Mill and Overlay State 3R Net Miles 14.200 Estimate Anticipated Funding $1,000,000 - $1,999,999 As of July 12, 2022, the project is in conceptual status. Anticipated letting date is July 25, 2023. WisDOT - USH 14 - Re/Reconditioning / Mill and Overlay *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents