Similar Projects
Zidell Yards - Master Plan
New Construction
Conception
Portland, OR 97239

Bohemian Restaurant
Renovation, Addition - 3,360 SF
Conception
Grants Pass, OR 97526

Block 216/Ritz Carlton
New Construction - 1,100,000 SF
Design
$600,000,000 est. value
Portland, OR 97205

Bakery Block
New Construction, Renovation
Design
Beaverton, OR

Coffenberry Middle School Cafeteria Building
New Construction - 7,850 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Myrtle Creek, OR 97457

Target #T0608 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Salem, OR 97301

Target #T1406 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Fairview, OR 97024

Popeyes
New Construction - 2,333 SF
Construction
$500,000 to $1,000,000 CJ est. value
Forest Grove, OR 97116

Salt & Straw
Renovation
Construction
Eugene, OR 97401

MOD Pizza
New Construction - 2,800 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Roseburg, OR 97471

Sunriver Brewing Co. Eastside Pub
New Construction - 4,000 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Bend, OR 97701

Chase Bank
New Construction - 3,355 SF
Post-Bid
$550,000 est. value
Milwaukie, OR 97267

Salt & Straw
Renovation
Construction
Beaverton, OR

Chipotle Mexican Grill - Shell Building
New Construction - 2,325 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Medford, OR 97501

Lean Feast
Renovation - 1,528 SF
Post-Bid
Happy Valley, OR

Reported 03/30/2022 01:55 PM
Project Title

2nd And Main Commons

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97123   (Washington County)
Category(s) Commercial
Sub-Category(s) Bank, Food/Beverage Service
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

16,331 SF - Bank, 13,000 SF Demolition, Food/Beverage Service, 2 Stories Above Grade, 3,000 SF Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Windows, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents