Similar Projects
Last Updated | 05/15/2023 02:15 PM |
Project Title | Component 2: Reconstruction of Dock Face Phase 3 - Rebid |
Physical Address | View project details and contacts |
City, State (County) | Toledo, OH 43605 (Lucas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Dock/Pier/Marine, Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $11,310,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Waterfront: Removal of Old Fendering System, Supply and Install New Fendering, Repair Sheet Pile Wall, and Create New Drainage Openings in the Sheet Pile Wall. Remove and Replace the Sheet Pile Concrete Cap. Dock Surface: Remove Existing Crane Rails, Remove Pavement to 50 Feet From Sheet Pile Wall, Removal Electrical Manholes and Conduit, Furnish and Install New Drainage, Backfill and New Pavement. Pavement Will Also Be Required Between Tracks in the Areas of the Track Where There Are Turnouts or Switches. In Addition, Tie Backs, as Directed on the Drawings, Should Be Completely Dug Up So That They May Be Inspected. A Portion of the Existing Storm System Will Need to Be Reworked Including a Lift Station. This Will Require Excavation, New Pipe, Manholes, Backfill and Discharge Through the Sheet Pile Wall. The Electrical Power for the Lift Station Is to Be Coordinated With the Electrical Contractor. Railroad Track: Track Is to Be Removed and Replaced, Including Ballast. Precast Concrete Crossing Panels Will Also Be Installed Along the Tangent Portions of the Track. The Base Bid for the Dock Surface and Rail Would Be Too Non-perform Replacement Between 0+00 and 2+50 and Also 37+00 to 41+60. The Alternate for This Area Would Be to Remove and Replace as Indicated. Phasing: the Port of Toledo Operations Will Continue Through Construction. As Such, the Dock Face Reconstruction Will Be Completed in Sections Along the Dock. All Work Must Be Completed in a Section of the Dock (Including Rail and Pavement) Prior to Moving to the Next Section. The Drawings Currently Show 5 Phases to Complete the Dock Restructuring. The Order and Location of These Phases Are Indicated on the Drawings, However, Toledo-lucas County Port Authority and Midwest Terminals of Toledo Inc., May Reorder the Phases During Construction to Fit the Shipping Schedule. General: This Is a Lump Sum Bid. All Quantities Shown on the Bid Sheet Are to Be Verified With the Plan Documents by the Bidder. The Sum of the Line Items May Not Add Up to Your Total Lump Sum Fee. These Unit Prices Are to Be Used in the Event of an Owner Directed Change to the Contract Documents. This Project Is Funded Through a U.s. Dept. Of Trans. Maritime Administration (Marad) Pidp Grant and an Ohio Maritime Assistance Program Grant (Map). The Engineer's Estimate for Component 2: Reconstruction of Dock Face Phase 3 - Rebid Combined Total Is Approximately $13,200,000.00. The Base Bid Is Approximately $11,800,000.00, and Alternates 1 Through 6 Are Approximately $1,400,000.00. Bids That Are in Excess of 10% Above the Engineer's Estimate Would Be Considered Non-responsive. This Project May Be Awarded by the Toledo-lucas County Port Authority at Its Sole Discretion. Only Qualified Contractors Are Eligible to Submit Bids for This Project. Contractor Qualification Status Must Be in Force at the Time of Bidding, at the Time of Award, and Through the Life of the Construction Contract. Please Submit All Questions to the Port Authority, Tina Perkins at Tperkins@toledoport.org by Wednesday, May 18, 2022, at 10:00 Am Local Time. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |