Last Updated 02/15/2021 04:28 AM
Project Title

Ambuc Baseball Complex Improvements

Physical Address View project details and contacts
City, State (County) Savannah, GA   (Chatham County)
Category(s) Entertainment/Recreation, Sewer and Water, Single Trades
Sub-Category(s) Athletic Facility, Electric, Landscaping/Irrigation, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of completing the grading of the site, construction of the building and surrounding hardscape, relocation of existing electric power feeds and controls for lighting and irrigation from the existing pad and panel to the building, installation of a grinder pump and extension of force main to it, installation of water service line. Compliance with the requirements of the NpDES Georgia general permit, with the exception of stormwater monitoring, is included. Traffic impacts will be minimal, but the work must be completed with minimal impacts to the ongoing activities at the complex. Capacity for stormwater flow must be maintained at all times, although temporary blockages are acceptable. A soil erosion and sedimentation control plan is provided and must be implemented prior to, and maintained during, construction. Coordination with the City of Savannah for water and sewer utilities is not required, although the project is subject to periodic inspections by the City for compliance with erosion control an code control and other items regulated by the City. The building will also require inspections as required by code.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents