Similar Projects
Boiler Replacement Tootin Hills Elementary School
Renovation
Sub-Bidding
$300,000 CJ est. value
West Simsbury, CT 06092

HVAC Services at Quinebaug Valley Community College
Term Contract
Sub-Bidding
Hartford, CT 06105

On-Call HVAC Services
Term Contract
Post-Bid
Berlin, CT

Sage Park Middle School HVAC Renovation Project Phase 2
Alteration
Post-Bid
Windsor, CT 06095

Replacement of the Daiken VRF System at Illing Middle School
Results
Manchester, CT 06040

Partial Roof Replacement and Installation of New Roof-Top Units
Alteration
Results
Hartford, CT

3rd Floor HVAC Replacement
Infrastructure
Sub-Bidding
$750,000 CJ est. value
Hartford, CT 06103

55 Farmington Avenue HVAC Upgrades
Alteration
Post-Bid
$446,975 to $494,025 est. value
Hartford, CT 06105

Milo Peck Child Care School Energy and Efficiency HVAC Upgrades
Alteration
Results
Windsor, CT 06095

HVAC System Replacement
Alteration
Post-Bid
East Granby, CT 06026

HVAC Repairs, Maintenance and On Call Services
Alteration
Results
Waterford, CT

Terminal HVAC Improvement Project - Bradley International Airport
Renovation
Post-Bid
$3,290,000 CJ est. value
Windsor Locks, CT 06096

Auditorium Air Handling Unit Replacement at King Philip Middle School
Alteration
Results
West Hartford, CT 06117

Windsor Avenue Community Center Gym HVAC
Alteration
Post-Bid
Windsor, CT 06095

Kitchen Hood Cleaning
Alteration
Results
Farmington, CT 06030

Last Updated 05/12/2023 09:01 AM
Project Title

HVAC Work for Slade Middle School

Physical Address View project details and contacts
City, State (County) New Britain, CT 06052   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,150,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following: 1. HVAC and related work including hazardous material removal/Structural/Architectural to complete all HVAC work as described in the Construction Documents. 2. Removal of all hazardous materials. Refer to hazardous materials report and related description. 3. Coordinate with roofing contractor (separate Contract) for metal deck infill (existing exhaust fans), installation of all RTUs condensing units. 4. Reinstall any units which are existing to remain including all reconnections. 5. New RTU units, DOAS units, condensing units, including all blocking/new curbs, refrigerant piping, supports and necessary roof work. 6. All structural framing and metal deck infill. 7. New duct work including all architectural work. 8. All demolition of architectural work required to facilitate new construction and restoration of all disturbed work. 9. Temporary patch all floor openings with 3/4 plywood and safety tape for protection until all duct work is completed in all occupied spaces including making floor openings. 10. Coordinate all roof work with the Roofing Contractor (under separate Contract). 11. Remove/relocate all electrical not limited to data, projector/smartboard, clocks, classroom speakers. 12. Cut all toilet room doors for new louvers. 13. Classroom VFR units (Alternate No. 1) 14. Alternates Nos. 2 through 6. 15. Relocation of vent pipes and related work (patching of ceilings). The Consolidated School District of New Britain, will be accepting sealed bid proposals for the following:Qualified contractors for HVAC work for Slade Middle School, not limited to removal of Hazardous Material, Architectural and Mechanical, Electrical and Plumbing work. RFI Deadline: Monday April 10th 2023 @ 4pm

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents