Similar Projects
Concrete Replacement Program
Post-Bid
Thornton, CO

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

Groundwater Recharge Ponds Pilot Project
Results
Thornton, CO

Quincy Intertie Improvements
Results
$7,400,000 to $8,400,000 est. value
Aurora, CO

High Point PD1 Pond Project
Infrastructure
Post-Bid
Denver, CO

Water World Alpine Springs Structural Concrete
Results
Federal Heights, CO 80260

48th Avenue Grading Project
Infrastructure
Post-Bid
Aurora, CO

152nd Avenue and Imboden Road Drainage Improvements
Results
CO

Quincy Reservoir Improvements, Package C - Aeration System
Infrastructure
Post-Bid
$1,300,000 to $1,500,000 est. value
Aurora, CO

South Platte Bank Stabilization
Results
$1,830,000 to $2,200,000 est. value
Aurora, CO

Underground Drainage Pipe Cleaning
Term Contract, Infrastructure
Post-Bid
Thornton, CO

Reunion Center Stead School Phase District: Reunion Center Metropolitan District No 1
Results
Commerce City, CO 80022

48th Avenue General Improvements Project
Infrastructure
Post-Bid
Denver, CO 80249

124th Reservoir Riprap Erosion Protection Construction Project
Results
Brighton, CO

Box Elder Infrastructure Development Phase 1
Infrastructure
Post-Bid
Aurora, CO

Last Updated 11/24/2021 05:00 PM
Project Title

Waddell Park Drainage Improvements and Concrete Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80221   (Adams County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 to $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include tear out specific areas of concrete, trench and install drain pipe, surface drains and possible shallow curb areas and drain pans to capture and redirect storm water away from infield and grass surface areas. Final concrete replacement and finishing will be required to complete the project.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents