Similar Projects
SR 3/Cascade Aveune Signal - Signal Replacement
Infrastructure
Conception
$470,000 CJ est. value
Bremerton, WA 98312

SR 3/SR 304 to SR 303 - Paving
Infrastructure
Design
$2,454,000 CJ est. value
Silverdale, WA 98383

SR 166/Port Orchard - Rebuild Signals
Infrastructure
Design
$1,905,000 CJ est. value
Port Orchard, WA 98366

Central Kitsap Fire and Rescue Station 57 - Part 1
New Construction, Infrastructure - 10,740 SF
Bidding
$7,300,000 CJ est. value
Bremerton, WA 98312

RFP D/B - SR 3, SR 104, SR 303 and SR 307, Kitsap County Remove Fish Barriers
Infrastructure
Bidding
$350,000,000 CJ est. value
Bremerton, WA 98312

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Well Drilling
Infrastructure
Post-Bid
Bainbridge Island, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Bangor Keyport Force Main Replacement
Renovation, Infrastructure
Results
$23,200,000 to $24,700,000 est. value
Poulsbo, WA 98370

New Gymnasiums at David Wolfle Elementary School and Suquamish Elementary School - North Kitsap School District
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Kingston, WA 98346

Poulsbo Middle School Addition / Expansion - North Kitsap School District
Addition, Demolition, Infrastructure - 17,700 SF
Pending Verification
$4,814,400 CJ est. value
Poulsbo, WA 98370

Temporary Front Street One-Way Detour for Raised Crosswalk Installation
Infrastructure
Design
$400,000 CJ est. value
Poulsbo, WA 98370

Green Mountain Vista Shelter & Renovation
Renovation, Infrastructure
Bidding
$119,710 CJ est. value
Bremerton, WA 98312

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Burley Glenwood Elementary School - ADA Site Improvements
Infrastructure
Results
$500,000 to $600,000 est. value
Port Orchard, WA 98367

Last Updated 10/12/2022 03:12 PM
Project Title

Pump Station 14 Relocation

Physical Address View project details and contacts
City, State (County) Bremerton, WA 98337   (Kitsap County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project will relocate and replace existing Pump Station 14 located in East Bremerton, WA. The new pump station will include two vertical turbine pumps with variable frequency drives (VFDs), an interior standby generator, provisions for secondary chlorination and a public ADA accessible bathroom. An approximately 800 square foot pump station building will be constructed of concrete masonry unit (CMU) walls with a concrete slabon-grade floor. Additional onsite improvements will consist of new asphalt pavement, two stormwater bioretention areas and approximately 600 linear feet of new 8-inch ductile iron water main. ESTIMATE: $2,300,000 - $2,400,000 PRECONSTRUCTION WORK PHASE: The preconstruction work phase is 90 calendar days following the Limited Notice to Proceed. The Limited Notice to Proceed is expected to be issued the first week of December 2022. COMPLETION OF WORK: The Substantial Completion date is 450 calendar days following the Notice to Proceed. The Notice to Proceed is expected to be issued the first week of March 2023. BID SECURITY: Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashiers check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. The failure to furnish a bid deposit of a minimum of five percent shall make the bid nonresponsive and shall cause the bid to be rejected by the Contracting Agency. PERFORMANCE BOND: The successful bidder will also be required to provide a Performance Bond for 100 percent of the Contract Price. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton. Contractor shall file a Statement of Intent to Pay Prevailing Wages with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. Contractor will be required to pay Kitsap County Prevailing Wage Rates current on the bid opening date. The Kitsap County prevailing wage rates are available at the Dept. of Labor and Industries website. The City of Bremerton reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most satisfactory and responsible bidder and shall be the sole judge thereof *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents