Similar Projects
Last Updated | 02/21/2023 01:05 PM |
Project Title | I-35 Capital Express Central - Texas Department of Transportation (TxDOT) |
Physical Address | View project details and contacts |
City, State (County) | Austin, TX 78702 (Travis County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected November 2025 |
Bids Due | View project details and contacts |
Estimated Value | $4,900,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The I-35 Capital Express Central project proposes to add two non-tolled managed lanes in each direction along I-35 from US 290 East to SH 71/Ben White Boulevard. Managed lanes are proposed in high-congestion areas where right of way is limited. These lanes are designed to provide a less congested route than adjacent general-purpose lanes during peak periods for qualifying vehicles. Managed lanes control access by placing restrictions on use. TxDOT is evaluating a variety of design options to add the non-tolled managed lanes. The project also includes additional safety and mobility improvements. As of January 19, 2023, plans are progressing and community outreach and planning efforts are continuing. A preliminary plan has been released. Funding is now being discussed. The owner plans to select a contractor in 2024, with construction set for late 2025. *For more information, please refer to https://my35capex.com/projects/i-35-capital-express-central/ |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |