Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Design
Cascade, ID

Road Improvement Project on the Sawtooth National Forest
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Stanley, ID 83278

For the Work of Rehabilitating the Roadway on SH-55 between MP 101.545 and 108
Infrastructure
Bidding
ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Warranty Double Chip Seal Coat
Infrastructure
Post-Bid
Lewiston, ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

I-90, SH-41 Interchange
Infrastructure
Bidding
ID

Lilly Street Reconstruction a Street to Third Street
Alteration
Post-Bid
Moscow, ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

2022 Street Preservation - Seal and Fog Coat
Infrastructure
Bidding
Lewiston, ID

Supply and Apply Gravel Road Stabilization
Infrastructure
Post-Bid
Coeur d'Alene, ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

2022 Street Preservation - Slurry Seal
Infrastructure
Bidding
Lewiston, ID

Reported 03/30/2022 01:21 PM
Project Title

SFSR Overlay and Chip Seal project on the Payette National Forest

Physical Address View project details and contacts
City, State (County) McCall, ID 83638   (Valley County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing and patching asphalt edge cracking, removal of surface drains, placing a 2” asphalt overlay on approximately 7.5 miles of the roadway, and chip sealing approximately 9 miles of the roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents