Similar Projects
DEMA HVAC Service, Repair, Maintenance
Alteration
Bidding
Bellemont, Buckeye, Florence, Marana, Phoenix, Show Low, AZ 85008

DEMA HVAC Service, Repair, Maintenance
Alteration
Bidding
Bellemont, Buckeye, Florence, Marana, Phoenix, Show Low, AZ 85008

Cooling Tower Replacement
Post-Bid
Goodyear, AZ 85395

J043--644 - Annual Chiller, Condensers, & Evaporator Testing
Post-Bid
Phoenix, AZ 85012

Shepherd Junior High Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85205

Robson Elementary Cooling Tower Repairs
Results
Mesa, AZ 85204

Plumbing and HVAC Repair and Maintenance Services
Alteration
Bidding
Tempe, AZ

HVAC System Coil and Air Handler Cleaning
Term Contract
Post-Bid
Phoenix, AZ 85003

Cavett, Manzo and Wheeler Elementary Schools Kitchen A/C Conversion
Term Contract
Results
$250,000 to $300,000 est. value
Tucson, AZ 85745

Water Conditioning And Treatment Services For Hvac - Statewide
Alteration
Bidding

VA Tucson Replace Air Distribution Systems - Building 57
Post-Bid
Tucson, AZ

Construction Manager At Risk - Mark Wilmer Pumping Plant HVAC Replacement Project
Results
Phoenix, AZ

Fire Station FEMA Exhaust System
Alteration
Bidding
$700,000 to $800,000 est. value
Mesa, AZ

Mount Elden Middle School AHU Replacement - SFB
Post-Bid
Flagstaff, AZ 86004

IHS1397567 Solicitation Preventive Maintenance and Repair for the Fume Hoods, PIMC
Results
Phoenix, AZ 85016

Last Updated 11/08/2021 12:56 PM
Project Title

AC Compressor with Installation Services

Physical Address View project details and contacts
City, State (County) Tsaile, AZ   (Apache County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide services to include: The Contractor will lock out the Trane Chiller Unit. Isolate condensing section of the A/C) unit. Recovery the refrigerant from both sides. Replace the one bad compressor on each circuit to the compressors. Evacuate and leak check the system. Reinstall the refrigerant and change the dryers. Change the contactors on the two bad compressors. Turn unit back on. Checked operation is good and running 100% and ensure that the unit is fully operational.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents