Similar Projects
J Street Well House Upgrades
Results
Seaside Park, NJ 08752

Well No. 4 Redevelopment
Infrastructure
Results
Stafford Township, NJ 08050

Well No. 12 Redevelopment General Description of the Project
Results
Manahawkin, NJ 08050

Rehabilitation of Potable Water Supply Well #3
Results
Lavallette, NJ

Well No. 5 Decommissioning
Demolition
Results
$66,000 est. value
Little Egg Harbor, NJ

Reconstruction of Well 5 Redrill Western Service Area
Infrastructure
Results
Manchester Township, NJ

Well Systems Installation, Service and Repair
Results
Toms River, NJ

Pumps Repair, Machining and Balancing Services
Results
Bayville, NJ 08721

Well No. 11 Replacement
Results
Brick, NJ 08724

Sump and Sewage Ejector Pump Service
Term Contract
Results
NJ

Well Maintenance and Redevelopment Services
Infrastructure
Post-Bid

Furnish and Deliver Various Spare Parts for Sutorbilt Gas Pumps
Infrastructure
Post-Bid
Berkeley Township, NJ

Furnish and Install Two (2) New Limitorque Valves, or Equivalent Operators for Effluent Pump 01 and 02 at Southern Water Pollution Control Facility (SWPCF) and Startup Services
New Construction
Results
Bayville, NJ 08721

Well Drilling, Maintenance and Repair
Term Contract, Infrastructure
Results
Manchester Township, NJ

Well No. 9 Rehabilitation
Infrastructure
Post-Bid
Point Pleasant, NJ 08742

Last Updated 06/16/2022 11:28 PM
Project Title

Water Sustainability Act (WSA) Well 6 and Environmental Site Assessment (ESA) Well 11 Overboard

Physical Address View project details and contacts
City, State (County) Manchester Township, NJ   (Ocean County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents