Similar Projects
LaCrosse - Westby, .17 Mi. E. Mathison Lane to High Echo Lane
Infrastructure
Bidding
La Crosse, Westby, WI

Lansing - Desoto, Iowa State Line to STH 35
Infrastructure
Bidding
De Soto, WI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Single Sealcoat
Post-Bid
Gays Mills, WI

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Seal Coat
Post-Bid
La Farge, WI

City of Prairie Du Chien - STH 35, E. Frederick Street to Cliffwood Drive
Results
Prairie du Chien, WI

Seal Coat
Post-Bid
La Farge, WI

Street Improvements
Results
Ferryville, WI

Gravel and Seal Coat
Post-Bid
La Farge, WI

2021 Infrastructure Improvements - Main Street
Results
La Farge, WI

Seal Coat Bids
Post-Bid
WI

Last Updated 12/20/2021 12:55 AM
Project Title

Ferryville - Genoa, Old Highway. 35 to STH 56 / B-62-93, 264

Physical Address View project details and contacts
City, State (County) (Crawford, Vernon Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Crawford and Vernon Counties; 5160-07-71, WISC 2022 068; STH 35; 0.000 Miles; Mill and Relay, Grade, Base, Concrete Pavement, Asphalt Pavement, Beam Guard, Pavement Marking, and Structures. Excavation Common, 7,655 CY; Borrow, 3,108 CY; Backfill Granular, 14,992 Ton; Backfill Structure, 2,065 Ton; Base Aggregate Dense, 16,585 Ton; Select Crushed Material, 1,453 Ton; Breaker Run, 328 Ton; Concrete Pavement, 39 SY; Concrete Masonry Bridges, 22 CY; Concrete Masonry Overlay, 20 CY; Bar Steel Reinforcement, 43,090 Lbs; Bar Steel Reinforcement Coated, 6,830 Lbs; Marking Epoxy, 355,049 LF; Construction Staking, 67,386 LF; Construction Staking, 21 Each; Construction Staking, 1 LS; Culvert Pipe, 832 LF 24”, 417 LF 36“, 310 LF 48“; Beam Guard, 18,006 LF; Beam Guard Energy Absorbing Terminals 36 Each; Asphaltic Surface, 816 Ton; HMA Pavement, 49,648 Ton; Removing Asphaltic Surface Milling, 239,726 SY; Tack Coat, 25,850 Gals; CIR Asphaltic Base Layer, 161,887 SY; Mill and Relay, 83,531 SY; Asphaltic Stabilizing Agent, 727 Ton; Riprap, 314 CY; Sprayed Asphaltic Surface Treatment, 3,904 Gal; Salvaged Asphaltic Pavement, 11,510 Ton; Shot Rock, 1,272 Ton.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents