Similar Projects
Pavement Resurfacing With Guide Rail and Sign Replacement, i-81 From Exit 7 To Cortland County Line, Towns Of Baker, Lisle and Triangle
Infrastructure
Bidding
$20,600,000 est. value
Barker, Chenango Forks, Lisle, NY 13746

2021 Catchbasins, Manholes, and Streets and Utilities Improvements
Post-Bid
Binghamton, NY

Kemp Drive Reconstruction
Post-Bid
Endwell, NY

Robinson Street Reconstruction - Lower Section
Results
Binghamton, NY 13901

2020 Street and Utility Improvements Phase II
Results
Binghamton, NY 13901

DECO District Streetscape Improvement Project Phase 1: State Street
Infrastructure
Post-Bid
Binghamton, NY

2020 Street and Utility Improvements Phase III
Results
Binghamton, NY 13901

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Harry L Drive and Reynolds Road Pavement Preservation
Results
Less than $800,000 est. value
Johnson City, NY 13790

General Infrastructure Repairs - Department of Public Works
Term Contract
Post-Bid
Less than $35,000 est. value
NY

Hooper Road/Watson Boulevard Intersection Improvements
Results
$250,000 to $500,000 est. value
Endwell, NY 13760

Resurfacing I-81
Results
Binghamton, Kirkwood, NY

Signal Replacement and Intersection Reconstruction at Vestal Parkway East and Clayton Ave
Results
$2,500,000 est. value
Vestal, NY

Highway Job Order Contract (JOC)
Results

Preventative Maintenance, Resurfacing Project: Us Route 11
Results
$2,000,000 est. value
Chenango Forks, NY

Last Updated 01/18/2022 12:56 PM
Project Title

Floral Avenue 1R Pavement Preservation Project

Physical Address View project details and contacts
City, State (County) Johnson City, NY 13790   (Broome County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The projects limits extend along Floral Avenue from Orchard Avenue to 150 feet east of Ackley Avenue. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Asphalt milling, asphalt paving, installation of signing and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving Rehabilitation, Cold Milling Asphalt Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents