Similar Projects
Water Rehabilitiation and Restoration - Service Saddle Replacement Program
Infrastructure
Bidding
Monument, CO 80132

6-Inch CIP Water Main Lining
Infrastructure
Post-Bid
Colorado Springs, CO 80900

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Centralized Treatment Raw Water Line
Results
$300,000 to $350,000 est. value
Colorado Springs, CO 80906

New Fire Station Utility
Construction
Falcon, CO 80831

Northern Regional Water Delivery Project Segment D
Infrastructure
Construction
Less than $500,000 est. value
Monument, CO

Upper West to East Water Transmission Line
Infrastructure
Post-Bid
$8,000,000 est. value
Colorado Springs, CO 80902

Well No 4 Treatment Plant Connection Line
Results
Fountain, CO

Forest Lakes and Monument Interconnect
Infrastructure
Post-Bid
Monument, CO

Water System Improvement Project
Results
Falcon, CO

Banning Lewis Ranch - Public 24 Inch PVC Water System Plan Improvements
Infrastructure
Post-Bid
Colorado Springs, CO 80902

Water Utility Construction Services
Results
Less than $23,665 est. value
Colorado Springs, CO 80919

Rolling Hills Tank Inlet Pipeline
Results
Colorado Springs, CO

Cellular Domestic Water Meter Installation
Results
Colorado Springs, CO

Last Updated 02/14/2022 09:27 AM
Project Title

Construction for Water System Improvements

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80902   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $818,653
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consisting of two independent schedules of work including: Schedule 1 - mobilization; potholing of existing utilities; cut permits complete with traffic control plan pursuant to requirements of El Paso County; provide labor and equipment for the installation of Owner furnished materials including 6-inch diameter ductile iron pipe (DIP) – 22 lineal feet (LF); 8-inch diameter DIP – 1,116 LF; 10-inch diameter DIP – 15 LF; 6-inch diameter gate valve – 1 each (EA); 8-inch diameter gate valve – 9 EA; ¾-inch service tap on DIP – 22 EA; ¾-inch SIDR7 polyethylene (PE) service line – 165 LF; 6-inch fire hydrant assembly – 1 EA; connection of existing mains to new mains – 5 EA; 2-inch temporary blowoff assembly – 1 EA; removal and replacement of 4 inches of aggregate base course and 4 inches of hot mix asphalt - 964 square yards (SY); removal and replacement of concrete curb and gutter – 15 LF; removal and replacement of concrete sidewalk – 27 square feet (SF); and demobilization. Schedule 2 - mobilization; potholing of existing utilities; cut permits complete with traffic control plan pursuant to requirements of El Paso County; 6-inch diameter ductile iron pipe (DIP) – 51 LF; 8-inch diameter DIP – 1,595 LF; 6-inch diameter gate valve – 1 each (EA); 8-inch diameter gate valve – 6 EA; ¾-inch service tap on DIP – 39 EA; ¾-inch SIDR7 polyethylene (PE) service line – 554 LF; 6-inch fire hydrant assembly – 1 EA; removal and replacement of 4 inches of aggregate base course and 4 inches of hot mix asphalt – 1,480 SY; removal and replacement of concrete crosspan – 207 SF; removal and replacement of concrete curb and gutter – 18 LF; removal and replacement of concrete sidewalk – 17 SF; demobilization and all associated appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents