Project Title | STH 11 - Mineral Point, County Shop Road - Minvera Street, STH 11 - Mineral Point, County Shop Road - Minvera Street |
Physical Address | View project details and contacts |
City, State (County) | Mineral Point, WI 53565 (Iowa, Lafayette Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | STH 23; 1.491 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Sidewalk, Signs, Beam Guard, Pavement Marking, Storm Sewer, Sanitary Sewer, Water Main, Street Lighting, Retaining Walls, Bridge Deck Replacement, Culvert Extension, and Plantings. Consist of excavation, grading, base aggregate, milling asphalt, HMA pavement, bridge construction, gravity retaining wall, MSE retaining wall, concrete curb and gutter, concrete sidewalk, storm sewer, landscaping, guardrail, pavement marking, sanitary sewer system components, water distribution system. Excavation Common, 26,959 CY; Excavation Rock, 19 CY; Backfill Structure, 423 Ton; Base Aggregate Dense, 30,256 Ton; Select Crushed Material, 35,102 Ton; Breaker Run, 34 Ton; Concrete Masonry Bridges, 684 CY; Concrete Masonry Culverts, 22 CY; Bar Steel Reinforcement, 2,230 Lbs; Bar Steel Reinforcement Coated, 130,110 Lbs; Marking Epoxy, 23,653 LF; Construction Staking, 46,440 LF; Construction Staking, 267 Each; Construction Staking, 3 LS; Storm Sewer Pipe Reinforced Concrete, 1,115 LF 15“, 835 LF 18“, 3,578 LF 24“, 1,010 LF 30“, 776 LF 36“, 21 LF 48”, 529 LF 12”; Storm Sewer Culvert Pipe Reinforced Concrete Horizontal Elliptical, 43 LF 19“ X 30“, 150 LF 34“ X 53“, 29 LF 24“ X 38“, 335 LF 38“ X 60“, 650 LF 29“ X 45“, 188 LF 34” X 53”; Concrete Curb and Gutter, 14,395 LF; Concrete Sidewalk, 68,425 SF; Beam Guard, 812 LF; Beam Guard Energy Absorbing Terminals, 8 Each; Asphaltic Surface, 495 Ton; HMA Pavement, 11,642 Ton; Removing Asphaltic Surface Milling, 6,706 SY; Tack Coat, 3,130 Gals; Signs, 110 SF; Conduit Rigid Nonmetallic Schedule 40 2-Inch, 6,782 LF. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |