Similar Projects
Cedar Energy Center
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Chesapeake, VA 23323

The Commons
New Construction, Infrastructure
Conception
$140,000,000 CJ est. value
Chesapeake, VA 23323

Dominion North
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Chesapeake, VA 23323

Townhomes at Jolliff Landing
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Chesapeake, VA 23321

Propane Tanks and Propane Gas for Fire Stations
Infrastructure
Bidding
$253,000 CJ est. value
Chesapeake, VA 23320

Sam's Xpress Car Wash / Chesapeake
New Construction, Infrastructure - 4,114 SF
Post-Bid
$1,500,000 CJ est. value
Chesapeake, VA 23322

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Buchanan Street Waterline Renewal
Infrastructure
Results
Chesapeake, VA

Elbyrne Drive Water and Sewer Renewal
Infrastructure
Results
Chesapeake, VA

CTS - Chesapeake Expressway Repaving - 28-240 - City of Chesapeake
Infrastructure
Construction
$2,000,000 CJ est. value
Chesapeake, VA 23322

Centerville South Solar Farm
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesapeake, VA 23322

Centerville South Solar Farm
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesapeake, VA 23322

Tidewater Community College - Science/Engineering Building - 40-200 - Chesapeake
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Chesapeake, VA 23322

Convenience store with gas station
New Construction, Infrastructure
Design
$2,650,000 CJ est. value
Chesapeake, VA 23320

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Last Updated 06/06/2023 05:19 AM
Project Title

Nina Drive Area Outfall Improvements - 27-240 - City of Chesapeake

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23321   (Chesapeake City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,160,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE: https://www.cityofchesapeake.net/Assets/documents/departments/budget/FY+2023/Adopted+CIP+2023-2027/FY+2023-2027+Adopted+CIP.pdf This project funds drainage improvements to the Lisa Cove Outfall portion of the Nina Drive Area Outfall. The project will include drainage improvements to the system from the Lisa Cove Outfall to Salvadore Drive and to Colombo Avenue. It will also include improvements along Colombo Avenue across Coffman Boulevard and Pinta Drive to the Nina Drive intersection. Several pipes will be upgraded with this project. An improved conveyance system will also be designed and constructed. Easements and wetland mitigation may also be required. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of August 23, 2022, further details regarding design and construction have not been identified. _______________________________________________________________ https://www.cityofchesapeake.net/Assets/documents/departments/budget/FY2021-22/CIP/Adopted+CIP+Document+FY+22-26+update.pdf This project will complete drainage improvements to the Lisa Cove Outfall portion of the Nina Drive Area Outfall. The project will include drainage improvements to the system from the Lisa Cove Outfall to Salvadore Drive and to Colombo Avenue. It will also include improvements along Colombo Avenue across Coffman Boulevard and Pinta Drive to the Nina Drive intersection. Several pipes will be upgraded with this project. An improved conveyance system will also be designed and constructed. Easements and wetland mitigation may also be required. Project is included City of Chesapeake FY 2022-2026 CIP Page 308 __________________________________________________________ https://www.cityofchesapeake.net/Assets/documents/departments/budget/CIP+Approved+2020-2024/CIP+Approved+2021-2025/FY21-25+Approved+CIP+Document.pdf This project will complete drainage improvements to the Lisa Cove Outfall portion of the Nina Drive Area Outfall. The project will include drainage improvements to system from the Lisa Cove Outfall to Salvadore Drive and to Colombo Avenue. It will also include improvements along Colombo Avenue across Coffman Boulevard and Pinta Drive to the Nina Drive intersection. Several pipes will be upgraded with this project. The improved conveyance system will also be designed and constructed. Easements and wetland mitigation may also be required Project is included City of Chesapeake FY 2021-2025 Page 81 _______________________________________________________________________________________________________________________ www.cityofchesapeake.net/Assets/documents/departments/budget/CIP+Approved+2020-2024/CIP+Approved+2021-2025/FY21-25+Approved+CIP+Document.pdf This project will complete drainage improvements to the Lisa Cove Outfall portion of the Nina Drive Area Outfall. The project will include drainage improvements to system from the Lisa Cove Outfall to Salvadore Drive and to Colombo Avenue. It will also include improvements along Colombo Avenue across Coffman Boulevard and Pinta Drive to the Nina Drive intersection. Several pipes will be upgraded with this project. The improved conveyance system will also be designed and constructed. Easements and wetland mitigation may also be required. Project is included City of Chesapeake FY 2021-2025 CIP Page 81 ____________________________________________________________________________________________________________________________________________________________________________ This project will complete drainage improvements to the Lisa Cove Outfall portion of the Nina Drive Area Outfall. The project will include drainage improvements to system from the Lisa Cove Outfall to Salvadore Drive and to Colombo Avenue. It will also include improvements along Colombo Avenue across Coffman Boulevard and Pinta Drive to the Nina Drive intersection. Several pipes will be upgraded with this project. The improved conveyance system will also be designed and constructed. Easements and wetland mitigation may also be required. Est. Completion Date: 12/30/2022 As of May 13, 2020, easement acquisition to begin in May 2020. Power pole relocation is underway. Construction expected to begin in Summer 2020. Information regarding design firm and general contractor selection has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents