Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP - Construction Consultant: Estimation, Project Management and Construction
Demolition, New Construction, Infrastructure
Bidding
Aurora, CO 80011

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Erosion Control and Stormwater Management Contractor
Infrastructure
Post-Bid
Aurora, CO

Retaining Wall Installation Project
Results
Less than $100,000 est. value
CO

Crossroads Overlot Grading
Results
Greenwood Village, CO

Englewood Station Apartments
New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Englewood, CO 80110

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

2021 Water System Improvement - Central Package
Results
Aurora, CO 80040

RiverPark Mixed-Use Project / Littleton
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Littleton, CO 80120

Last Updated 12/09/2022 10:07 AM
Project Title

McArthur Ditch Water Diversion

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $535,725 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 9, 2022, the project has been awarded. A timeline for construction has not been confirmed. The McArthur Ditch Water Diversion project includes the demolition of an existing culvert, rehabilitation of the existing ditch segment and stilling basin, construction of a new diversion structure with the means to block the channel and divert water into the structure, and installation of a new flow measuring device with data logging equipment. The purpose of this project is to achieve accurate flow measurements as stipulated in the final decree in Water Court case number 2017CW3205. Question Acceptance Deadline 08/09/2022 04:00 PM EDT Questions are submitted online No This project award is contingent on the approval from U.S. Army Corp of Engineers on the submitted "Pre-Construction Notification for Nationwide Permit 3" for the proposed work. This was submitted on July 8, 2022. ESTIMATE AND COMPLETION DATES The estimated cost for this project is from $566,270.00 to $622,897.00. The Contract Documents require that all work be Substantially Complete by November 11, 2022 with Final Completion by December 7, 2022. LIQUIDATED DAMAGES Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $300.00 per day and begin to be assessed after failure to complete work by final completion date. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents