Similar Projects
Small Diameter Waterline Replacement - City of Johnson City
Infrastructure
Conception
$1,000,000 est. value
Johnson City, TN

STP Asphalt Overlay of Elmore, Street Elmo and Brunswick Roads - 458 - City of Bartlett
Infrastructure
Conception
$3,800,000 CJ est. value
Bartlett, TN 38134

Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Steel Utility Pole Installation
Infrastructure
Design
$90,000 CJ est. value
Forest Hills, TN 37215

Construction of the McCroskey Island WWTP Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Sevierville, TN 37862

Coleman Storage Tank Replacement
Infrastructure
Bidding
$128,000 CJ est. value
Memphis, TN 38103

Gap Creek Dog Park Fencing Project 2022-2023
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Elizabethton, TN 37643

Freewill Road/Hensley Road Water Main Improvements
Post-Bid
Cleveland, TN 37312

Joy Gleghorn Nature Preserve at Wells Hill Park Site Improvements
Post-Bid
Fayetteville, TN 37334

2018 CDBG Water System Improvements - 5th Street and City Tank Area
Results
$400,000 to $450,000 est. value
Jellico, TN

Water and Sewer Line Replacement
Results
$180,000 to $220,000 est. value
Jellico, TN

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

Mountain View Subdivision Phase 1
New Construction, Infrastructure
Conception
$17,400,000 CJ est. value
Spring Hill, TN 37174

ADA Compliance UTK and UTIA (UTIA Lewisburg)
Infrastructure
Design
$719,000 CJ est. value
Knoxville, TN 37996

Last Updated 08/12/2022 12:36 PM
Project Title

Carson Road/McConkey Street Water Lines and Miscellaneous Fire Hydrant Replacements

Physical Address View project details and contacts
City, State (County) Madisonville, TN 37354   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $696,616 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Carson Road/McConkey Street Water Lines and Miscellaneous Fire Hydrant Replacements 4,900 L.F. of 6-inch PVC Water Line 40 L.F. of 6-inch DIP Water Line Install 39 Fire Hydrants Replace 35 Water Service Connections, Valves, and Other Appurtenances The allotted time for construction for Contract 22-01 is ninety (90) calendar days; liquidated damages for non-completion are $1,000 per calendar day. All bidders must be licensed general contractors as required by the Contractors Licensing Act of 1976 of the General Assembly of the State of Tennessee and qualified for the type of construction being bid upon. EACH BIDDER SHALL WRITE ON THE OUTSIDE OF THE ENVELOPE CONTAINING THE BID THE CONTRACTOR'S LICENSE NUMBER, THE EXPIRATION DATE, AND THAT PART OF THE CLASSIFICATION APPLYING TO THIS BID. If this is not done, the bid will not be opened. Each bidder must deposit with his/her bid, security in the amount, form and subject to the conditions provided in the Instructions for Bidders. The successful bidder is required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. Each bidder shall be properly licensed and abide by the provisions of TCA 62-6-119 including part (b) which states in part: All bidders shall comply with all provisions of TCA 50-9-113 as it relates to Drug Free Workplace requirements. The Contractor shall complete the Drug-Free Workplace Affidavit of the Prime Bidder form and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor(s) compliance with said law. All bidders shall comply with all provisions of Chapter 878 of TCA 12-4-1 as it relates to certification of compliance regarding illegal immigrants. The Contractor shall complete the Statement of Compliance Certificate Illegal Immigrants and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor's compliance with said law. All bidders shall comply with all provisions of Chapter 817 of TCA 12-12-106 as it relates to certification of compliance regarding the Iran Divestment Act. The Contractor shall complete the Statement of Compliance Certificate Iran Divestment Act and submit it with her/her bid. The Contractor shall be responsible for any of its Subcontractor's compliance with said law. The Owner reserves the right to reject any or all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents