Similar Projects
Louisburg MS Early Parking Lot / Rockville Parking Lot
Post-Bid
Louisburg, KS

Moonlight Sidewalk
Post-Bid
Gardner, KS

2021 Street Resurfacing
Results
$3,500,000 to $4,200,000 est. value
Kansas City, KS

Road Construction, Moonlight Road
Results
KS

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

49th and Quivira CMP Stormwater Replacement
Infrastructure
Post-Bid
Shawnee, KS

Road Construction, East of Mission Road
Results
KS

Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

2021 Cars 50th Street and Stateline Road
Results
$100,365 est. value
Westwood Hills, KS

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

2021 Asphalt Overlay Program
Results
KS

Curb and Gutter Replacement
Infrastructure
Post-Bid
Topeka, KS 66606

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

Shawnee Heights Middle School Parking Lot Improvements
Infrastructure
Post-Bid
Tecumseh, KS

Mill and Overlay
Results
$831,421 est. value
KS

Last Updated 12/08/2021 07:22 AM
Project Title

Kimball Avenue North Campus Corridor Phase 9

Physical Address View project details and contacts
City, State (County) Manhattan, KS 66502   (Riley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include, but is not limited to, the following approximate major categories of work: Unclassified Excavation 9,400 CY, Compaction of Earthwork 9,500 CY, Concrete Pavement (9” Uniform)(AE)(NRDJ) 13,500 SY, Concrete Pavement (8” Uniform)(AE)(NRDJ) 1,650 SY, Concrete Pavement (6” Uniform)(AE)(NRDJ) 17,600 SY, Pavement Marking (Cold Plastic)(Var. Color & Width) 7,800 LF, Pavement Marking (Paint)(Var. Color & Width) 3,100 LF, Storm Sewer (Var. Dia.)(RCP) 3,200 LF Also included are Signage; Traffic Signalization; Sidewalk; Erosion Control; Gateway Monuments; Field Stone Low Wall; Irrigation System and Landscaping Elements; and Pedestrian Lighting

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Planting Irrigation.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents