Similar Projects
Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Structure, Approach Grading, PE
Demolition, New Construction, Infrastructure
Design
$462,000 CJ est. value
Cavour, SD 57324

Structure, Approach Grading, PE
Demolition, New Construction, Infrastructure
Design
$462,000 CJ est. value
Cavour, SD 57324

Structure & Approach Grading
Infrastructure
Bidding
$531,000 CJ est. value
Wolsey, SD 57384

Structure & Approach Grading
Infrastructure
Bidding
$531,000 CJ est. value
Wolsey, SD 57384

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Huron Multipurpose Building and Visitor Center
New Construction, Infrastructure - 9,000 SF
Post-Bid
$5,000,000 CJ est. value
Huron, SD 57350

2022-2023 Student Built House Project
New Construction, Infrastructure - 1,925 SF
Results
$1,920 CJ est. value
Huron, SD 57350

2nd Street, Water Loop, CAT 5.11 South Dakota State Fair
Infrastructure
Results
$106,880 CJ est. value
Huron, SD 57350

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$11,108,000 CJ est. value
Huron, SD 57350

Structure, Approach Grading, PE
Demolition, New Construction, Infrastructure
Design
$430,000 CJ est. value
Cavour, SD 57324

RFP D/B - Architectural and Engineering Services, State Fair Sewer Replacement Projects
Infrastructure
Post-Bid
$400,000 CJ est. value
Huron, SD 57350

Structure Replacement, Approach Grading, and Gravel Surfacing
Infrastructure
Results
$1,252,699 CJ est. value
Wessington, SD 57381

Structure, Approach Grading, PE
Demolition, New Construction, Infrastructure
Design
$462,000 CJ est. value
Huron, SD 57350

Last Updated 10/17/2023 10:03 PM
Project Title

SD FLAP 392(1) MAGA TA-HOHPI Access Road

Physical Address View project details and contacts
City, State (County) Huron, SD 57350   (Beadle County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is a solicitation and plans and specifications are available. PROJECT NUMBER: SD FLAP 392(1) PROJECT NAME: MAGA TA-HOHPI ACCESS ROAD PROJECT DETAILS: The purpose and need for this project is to provide improved all weather access to the Maga Ta-Hohpi unit of the Wetland Management District (WMD) through The Hartland Township approximately 7miles west of Huron, SD. The existing access via 392nd Ave has been fully inundated with water for years and will no longer be used. The existing 207th St. will be improved and used as the new permanent route to the Maga Ta-Hohpi Waterfowl Production Area (WPA) Maintenance facility. SCOPE OF THE WORK: The scope of work is to improve 207th Street to make a permanent route to the Maga Ta-Hohpi WPA Maintenance facility and to construct the entrance road and parking area for the new Headquarters/Visitor Center facility off US 14. A proposed parking area and entrance road for the new U.S. Fish and Wildlife Service (USFWS) headquarters. Proposed work includes rehabilitation and gravel surfacing of approximately 1 mile of existing 207th Street, from 392nd Avenue to 393rd Avenue, adjacent to the Maga Ta-Hohpi WPA. Earthwork, and raising road grade, are anticipated to address the existing surfacing problems on the road. Initial grading and final aggregate/asphalt surfacing for a proposed parking lot and entrance road will need to be coordinated with the contractor awarded to build the new USFWS headquarters. Both CFL and USFWS contractors will be working simultaneously to achieve the construction of parking lot and headquarters building. PRINCIPAL WORK ITEMS INCLUDE: Roadway Excavation 3,200 CUYD Clearing and Grubbing 9,000 SQYD Aggregate Surface Course 8,700 TONS Waste 2,785 SQYD Site Grading 4,900 SQYD The anticipated advertisement date for the project is October 2023 with construction start of March 2024. The estimated price range is between $2,000,000 and $5,000,000. This will be solicited as a Full & Open competition. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents