Similar Projects
Women's Baseball Center Museum - City of Rockford
New Construction, Infrastructure
Conception
$7,000,000 CJ est. value
Rockford, IL 61101

Well 45 Reservoir Reconstruction - City of Rockford
Infrastructure
Conception
$15,000,000 CJ est. value
Rockford, IL 61102

Alpine Dam Modernization Phase 2 - City of Rockford
Infrastructure
Design
$22,400,000 CJ est. value
Rockford, IL 61101

Colman Yards Barber Colman Mixed-Use Development
New Construction, Infrastructure, Build-out - 130,000 SF
Design
$400,000,000 CJ est. value
Rockford, IL 61101

City Wide Sidewalk and ADA Repairs Package #2
Infrastructure
Bidding
$64,229 CJ est. value
Rockford, IL 61101

City Wide Sidewalk and ADA Repairs Package #2
Infrastructure
Bidding
$64,229 CJ est. value
Rockford, IL 61101

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Parking Lot Crack Filling, Seal Coating, and Striping
Infrastructure
Post-Bid
Rockton, IL 61072

Cargo/Distribution Facilities Developer RFQ
Renovation
Results
Rockford, IL

1.86 Miles Stephenson County Line to 0.2 Miles W of Pecatonica Rd Smart Overlay With Longitudinal Joint Repair
Infrastructure
Results

Hard Rock Casino
Demolition, New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Rockford, IL 61108

Fleet Farm Retail Development
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Rockford, IL 61112

NorthPointe Birth Center
New Construction, Infrastructure - 8,700 SF
Pending Verification
$5,115,937 CJ est. value
Roscoe, IL 61073

ENGIE Solar Farm
Infrastructure
Conception
$5,000,000 CJ est. value
Rockford, IL 61108

Harlem High School Addition - Harlem Consolidated School District #122
Addition, Demolition, Infrastructure - 27,000 SF
Design
$13,500,000 CJ est. value
Machesney Park, IL 61115

Last Updated 07/11/2023 08:41 AM
Project Title

2023 MFT Streets Program

Physical Address View project details and contacts
City, State (County) South Beloit, IL 61080   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $982,181 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The MFT funded project includes HMA pavement removal, 4-inch full depth pavement reclamation, butt joints, roadway shaping and grading, HMA pavement surfacing, aggregate shoulder installation, 3" HMA mill and overlay, and removal and replacement of driveways. ILDOT - 2023 MFT Streets Program - 23-00000-00-GM

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents