Similar Projects
Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Concrete Safety Improvement Project
Infrastructure
Post-Bid
Castle Rock, CO

Mainstreet and Twenty Mile Road Intersection Improvements
Infrastructure
Post-Bid
CO 80138

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

On Call Region 1 Asphal Paving Services
Results

Tall Tales Ranch / Lone Tree
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
Parker, CO 80134

Ridgegate Southwest Village
New Construction, Infrastructure
Pending Verification
$440,000,000 CJ est. value
Lone Tree, CO 80134

Lincoln Avenue Widening - Keystone to Parker Road - Town of Parker
Infrastructure
Conception
$21,000,000 CJ est. value
Parker, CO 80134

Millers Landing Hotel
New Construction, Infrastructure
Design
$89,500,000 CJ est. value
Castle Rock, CO 80104

RFQ Contractor - General Contractors
Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Castle Rock, CO 80104

Asphalt Mill and Overlay of Two Middle School Tracks
Infrastructure
Results
Littleton, Parker, CO 80130

Last Updated 03/21/2023 05:07 AM
Project Title

2023 Asphalt Overlay Project

Physical Address View project details and contacts
City, State (County) Castle Rock, CO 80104   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,375,838 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, asphalt patching, various depths and types of milling of existing asphalt pavement, and various thicknesses of asphalt paving within the streets listed in the Appendices or as directed by the Project Manager. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contract shall be awarded based on bids received for the base bid schedule A and the contract documents. Night work shall be required and entail asphalt patching, asphalt milling, and asphalt overlay on 4th Street, between UPRR and Elbert Street, and 2nd Street between UPRR and Perry Street, as indicated in the maps. Work shall begin June 20, 2023 and be completed before July 21, 2023. Contractor will be required to coordinate construction activities with adjacent businesses, trash removal companies, school district, HOA, Metro Districts, and other Town maintenance projects if applicable. The contractor shall commence work no later than three (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within one hundred and sixty (160) working days from the date on the Notice to Proceed. If "Construction Completion" is not issued within the allotted contract time for the original scope of work, "Liquidated Damages" shall be assessed. When contract work is complete, the contractor shall commence work on punchlist items, cleanup, and demobilizing regardless of contract time remaining. Work shall take place between April 3, 2023 and November 3, 2023. A schedule of sequencing of all work shall be submitted at or before the project preconstruction meeting, and approved by the Town prior to issuance of Notice to Proceed. Buyers Requirements General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Insurance Required Question Acceptance Deadline 01/11/2023 06:30 PM EST Questions are submitted online No Job Location Town of Castle Rock

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents