Similar Projects
Y1DA--FY21 NRM Tier 2 (PROJ: 573-20-106) DB - Replace Flanged Valves Hospital Wide
Design
$1,000,000 to $5,000,000 est. value
Gainesville, FL 32608

HVAC Chiller System Preventative Maintenance and Repair - Logan Lab
Alteration
Bidding
Largo, FL 33778

Otech Chiller Replacement Project
Alteration
Bidding
$200,000 est. value
Kissimmee, FL 34744

Ground Transportation Facility GMP 8S.1
Post-Bid
Orlando, FL 32827

Replacement of Existing McQuay Chiller at Pensacola Downtown Public Library
Post-Bid
Pensacola, FL

Resins for Per Fluorinated Treatment System
Term Contract
Results
Stuart, FL 34994

Stormwater Pond Aeration Maintenance
Results
Fort Myers, FL 33913

Boiler and Water Heater Maintenance and Repairs
Alteration
Bidding
$75,000 est. value
Miami, FL 33166

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

Leachate Wastewater Treatment Plant Sand Filter
Results
$60,150 est. value
Punta Gorda, FL 33955

Pool Of Qualified General Contractors For Residential Rehab Projects
Renovation, Alteration
Bidding
Miramar, FL

Mechanical Insulation Services
Post-Bid
FL

Water Treatment for Cooling Towers and Closed Loop Systems
Term Contract
Results
Kissimmee, FL 34744

Deerhaven Chiller
Alteration
Bidding
Gainesville, FL 32653

Repairs to Degasifer Unit
Post-Bid
Miramar, FL

Last Updated 04/14/2022 09:17 AM
Project Title

Chiller System Replacement

Physical Address View project details and contacts
City, State (County) Tampa, FL 33610   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chillers and associated chilled water pumps at the Tampa Executive Airport have reached the end of their useful lives and would like to replace them with new like-in-kind equipment. The Owner has also determined that the existing Alerton Controls building automation system has reached the end of its useful life and would like to upgrade it to the latest version. This Project will consist of the replacement of two, air cooled chillers and associated end suction chilled water pumps with like-inkind replacements. Existing variable frequency drives, and auxiliary equipment will be replaced as noted in the Plans. In addition, the existing Alerton Controls building automation system will be upgraded to the latest version, including the front-end software and all major components of the building automation system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents