Similar Projects
3rd Avenue North 9th to 11th Street Reconstruction - City of Great Falls
Infrastructure
Conception
$500,000 CJ est. value
Great Falls, MT 59404

3rd Avenue North 9th to 11th Street Reconstruction - City of Great Falls
Infrastructure
Conception
$500,000 CJ est. value
Great Falls, MT 59404

Mt Bighorn Warman Loop Road
Term Contract
Design
MT

D/ B - Emergency Relief (ER) - Red Lodge Area Flood Repairs
Infrastructure
Design
$300,000 est. value
Red Lodge, MT 59068

Clarks Fork - 9 Miles South of Belfry
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Belfry, MT 59008

Clarks Fork - 9 Miles South of Belfry
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Belfry, MT 59008

Great Falls Water Treatment Plant Solids Mitigation Improvements
Addition, Renovation, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Great Falls, MT 59405

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Hudson Bay Divide South
Infrastructure
Results

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

52nd Street North 7th to 10th Avenue North Reconstruction - City of Great Falls
Infrastructure
Conception
$600,000 CJ est. value
Great Falls, MT 59405

Roberts Sewer Service Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Roberts, MT 59070

Last Updated 12/02/2022 01:04 PM
Project Title

Graves Creek Temporary Bridge Road No. 367 (M.p. 5.90)

Physical Address View project details and contacts
City, State (County) Thompson Falls, MT 59873   (Sanders County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located West of Thompson Falls, MT, at mile post 5.90 on NFSR 367 (see Site Plan). The Board reserves the right to reject any and all bids. The successful bidder will be expected to complete the work during the performance period of immediately upon award to June 1, 2022. No formal site visit is scheduled. Questions regarding this project may be directed to Jared Koskela, Plains/Thompson Falls RD at 406- 546-5894 or Ben Bache, Sanders County Road Dept. 406-531-1711.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents