Similar Projects
Brush Square - Phase 1 Implementation
Infrastructure
Bidding
$2,200,000 est. value
Austin, TX

Lazy Nine MUD 1B, Sweetwater Section 2, Village M and Q
Infrastructure
Bidding
Austin, TX

South Old Spanish Trail Drainage Improvement Project
Post-Bid
Less than $189,559 est. value
Uhland, TX 78640

Shadow Creek Drainage Channel Improvements
Post-Bid
TX

Southern Region Disaster Recovery Support BPA
Results

Signage Fabrication and Installation Services Idiq-2020
Results
San Marcos, TX 78666

Sessom Drainage and Street Improvements
Infrastructure
Bidding
$6,531,373 est. value
San Marcos, TX 78666

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Traffic Sign and Pavement Marking Services IDIQ - A
Term Contract
Bidding
$3,200,000 est. value
Austin, TX

Driftwood Phase 1 Section 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Crack Seal of Asphalt Pavement
Results
Less than $241,524 est. value
TX

Construction of Kissing Tree West Centerpoint Road Phase 3A
Infrastructure
Bidding
San Marcos, TX 78666

Old Fitzhugh Road Project
Post-Bid
$4,400,000 to $4,800,000 est. value
Dripping Springs, TX 78620

E Hopkins Pedestrian & Bike Improvements (Hopkins from CM Allen to Thorpe)
Results
Less than $1,750,000 est. value
San Marcos, TX 78666

Last Updated 12/31/2021 12:15 AM
Project Title

US 290 West at Henly Loop

Physical Address View project details and contacts
City, State (County) San Marcos, TX   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $360,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hays County (County) is soliciting for the construction at the intersection US 290 and Henly Loop. The construction will consist of intersection improvements of a right turn lane addition on Westbound US 290 at Henly Loop including paving, drainage, signing, and pavement marking.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents