Similar Projects
Badger Hollow II
New Construction, Infrastructure
Design
$195,000,000 CJ est. value
Montfort, WI 53569

Cuba City School District 2022 Bond - Elementary and High School
Addition, Demolition, Renovation, Infrastructure
Design
$36,000,000 CJ est. value
Cuba City, WI 53807

Stadele Ln Reconditioning
Infrastructure
Bidding
$75,000 CJ est. value
Muscoda, WI 53573

Watermain Extension 2023
Infrastructure
Bidding
$200,000 CJ est. value
Blue River, WI 53518

Resurfacing Project on Rural Ridge Road South of CTH Q
Infrastructure
Post-Bid
$62,000 CJ est. value
Cuba City, WI 53807

Salt Shed
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Cuba City, WI 53807

WWTF Upgrade 2021
Renovation, Infrastructure
Results
Dickeyville, WI

Blake Fork Stream Improvements
Infrastructure
Results
$105,000 est. value
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Red Barn Wind Farm
Infrastructure
Construction
$162,000,000 CJ est. value
Wingville, WI 53569

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

Dickeyville - Lancaster Const / Passing Lanes and Slopes / Misc
Infrastructure
Design
$7,000,000 CJ est. value
Lancaster, WI 53813

RFQ Engineering - Rehabilitation: Pavement Replacement
Infrastructure
Post-Bid
$15,000,000 CJ est. value
Cuba City, WI 53807

North Bypass and Second Street
Infrastructure
Results
Platteville, WI

Last Updated 05/23/2023 11:05 AM
Project Title

New Fire Station - City of Platteville

Physical Address View project details and contacts
City, State (County) Platteville, WI 53818   (Grant County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 23 2023, this project is in the preliminary design status. Although a firm timeline for construction has not been determined, construction is expected to start in 2023. This will be a replacement of the current fire station at 275 E. Main St. The new station will be a nearly 32,000-square-foot concept that includes eight truck bays, training rooms, administrative offices and living quarters. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

32,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents