Similar Projects
New Middle School #7
New Construction
Conception
Prosper, TX

High School #2 Construction
New Construction
Conception
Anna, TX

Tafolla Middle School Project
New Construction
Design
San Antonio, TX 78207

Road Runner Convenience Store
New Construction - 4,000 SF
Design
$700,000 est. value
Rusk, TX 75785

US 59 - Mill and Inlay
Infrastructure
Bidding
$1,633,143 CJ est. value
Lufkin, TX 75904

US 69 - Intersection Improvement
Infrastructure
Bidding
$1,278,488 CJ est. value
Tyler, TX 75706

TS Imelda Flood Reconstruction for Vidor Independent School District
Post-Bid
Vidor, TX 77662

Ground Up Construction Projects
Post-Bid
Austin, Fort Worth, Houston, San Antonio, TX

H.B. Zachry Middle School Magnet Addition/Renovation
Renovation, Addition
Results
$7,500,000 est. value
San Antonio, TX 78250

Construction of Harvest Townside Phase 3 Grading
Infrastructure
Results
TX

Frisco High School #12
Construction
Frisco, TX 75035

New Argyle Administration Building
New Construction
Construction
$4,890,554 est. value
Argyle, TX 76226

Borderbrick
New Construction, Infrastructure - 3,000 SF
Pending Verification
$175,000 CJ est. value
Brownsville, TX 78520

Hobby Middle School Magnet Facilities
Addition
Conception
$24,800,000 est. value
San Antonio, TX 78230

2019 Bond - Kitchen Renovations and Upgrades - Dumas Independent School District
Renovation
Design
Dumas, TX

Last Updated 07/22/2022 09:11 AM
Project Title

Malakoff New High School Site and Foundation Package

Physical Address View project details and contacts
City, State (County) Malakoff, TX 75148   (Henderson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This is an early site and foundation package for a new, 190,000 SF, 2-story High School for Malakoff ISD. The board meeting to approve our GMP is on 8/10. Please complete the Bid Form associated with your scope of work and submit along with your standard proposal. Please send all correspondence to JD Hale at bids@jacksonconstruction.com.

Details

2 Stories Above Grade, 190,000 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents