Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Infrastructure
Conception
$440,000 CJ est. value
Davenport, IA 52807

Wayfind Sign Project
Infrastructure
Design
Davenport, IA 52801

Main Street Landing - Destination Play Area and Event Lawn
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Davenport, IA 52803

PCC Patching
Infrastructure
Post-Bid
IA

East 2nd St. Streetscaping
Infrastructure
Results
Davenport, IA 52801

CDBG Group 2 - Reconstruction East 7th Street (Iowa to LeClaire) and LeClaire Street (6th-8th)
Infrastructure
Results
Davenport, IA 52803

Community Recreation and Aquatic Centers - City of Bettendorf
Addition, New Construction, Infrastructure, Renovation
Pending Verification
$22,000,000 CJ est. value
Bettendorf, IA 52722

New Juvenile Detention Center - Scott County
Demolition, New Construction, Infrastructure
Pending Verification
$21,750,000 CJ est. value
Davenport, IA 52803

Adler Theatre Plaster/Paint Repair - FP085 - City of Davenport
Infrastructure
Conception
$975,000 CJ est. value
Davenport, IA 52801

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

CDBG Alley Program - Reconstruction 1310 Kirkwood Avenue to1818 Esplanade
Infrastructure
Results
Davenport, IA 52803

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Leclaire Park Band Shell Upgrades - FP076 - City of Davenport
Infrastructure
Conception
$180,000 CJ est. value
Davenport, IA 52801

Bridgeview Elementary School 2022 Parking Lot Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Le Claire, IA 52753

Last Updated 06/14/2023 07:08 AM
Project Title

Riverdale City Hall Parking Lots Reconstruction

Physical Address View project details and contacts
City, State (County) Riverdale, IA 52722   (Scott County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $375,957 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of parking lot and sidewalk PCC pavement (1929 square yards), construction of new storm sewer (365 lineal feet), specialized treatment along sidewalk edges, removal and construction of new stairway, and new parking lot striping and signage. Each BIDDER shall accompany its bid with a bid security as security that the successful BIDDER will enter into a contract for the work bid upon and will furnish after the award of CONTRACT a corporate surety bond, acceptable to the OWNER, for the faithful performance of the CONTRACT, in an amount equal to 100 percent of the amount of the CONTRACT. The bid security shall be in an amount fixed by the OWNER and shall be in the form of a cashiers check, or certified check drawn on a state chartered or federally charted bank, or a certified share draft drawn on a state-chartered or federally chartered credit union. The Bid Bond shall contain no exceptions. The successful BIDDER shall be required to furnish a performance BOND and a payment BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, within ten (10) calendar days of the date when the NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accompanied by the necessary AGREEMENT and BOND forms. In case of failure of the BIDDER to execute the AGREEMENT, the OWNER may at his option consider the BIDDER in default, in which case the BID BOND shall become property of the OWNER. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents