Similar Projects
Trimble Road (Joppa Road to Garnett Road) - H204522 - Harford County
Infrastructure
Conception
$2,000,000 est. value
Joppatowne, MD 21085

Norrisville Park - P204117 - Harford County
New Construction, Infrastructure
Conception
$2,400,000 est. value
White Hall, MD 21161

For City of Havre de Grace - Rehabilitation and Replacement 8 Inch and 15 Inch Sanitary Sewer at Saint Johns and S. Washington Streets
Infrastructure
Design
$200,000 CJ est. value
Havre de Grace, MD 21078

For City of Havre de Grace - Rehabilitation and Replacement 8 Inch and 15 Inch Sanitary Sewer at Saint Johns and S. Washington Streets
Infrastructure
Design
$200,000 CJ est. value
Havre de Grace, MD 21078

Repair Slide MD 24 (Rocks Road) Section G: From 700 Feet South of Sharon Road to 2150 Feet South of Sharon Road Harford County
Infrastructure
Bidding
$10,000,000 CJ est. value
Street, MD 21154

Repair Slide MD 24 (Rocks Road) Section G: From 700 Feet South of Sharon Road to 2150 Feet South of Sharon Road Harford County
Infrastructure
Bidding
$10,000,000 CJ est. value
Street, MD 21154

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construction Management Services for Water and Waste Water Project
Infrastructure
Post-Bid
Bel Air, MD

Drainage Outfall Rehabilitation
Infrastructure
Results
$2,793,273 CJ est. value
Baltimore, MD 21202

Drainage Outfall Rehabilitation
Infrastructure
Results
$2,793,273 CJ est. value
Baltimore, MD 21202

Shops at Harford Mall
New Construction, Infrastructure - 59,609 SF
Construction
$16,000,000 CJ est. value
Bel Air, MD 21014

Bel Air Village
New Construction, Infrastructure - 129,130 SF
Construction
$143,000,000 CJ est. value
Bel Air, MD 21015

Country Walk
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Bel Air, MD 21015

YourSpace At Five43
New Construction, Infrastructure - 118,850 SF
Pending Verification
$16,000,000 CJ est. value
Bel Air, MD 21015

Central W&S Laboratory - W205425 - Harford County
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Abingdon, MD 21009

Last Updated 07/11/2023 03:06 AM
Project Title

Water Main Replacement Congress Ave, Commerce and Revolution Street(s)

Physical Address View project details and contacts
City, State (County) Havre de Grace, MD 21078   (Harford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $4,667,541 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work under the contract includes: 1.1.1 New 8 Water main approximately 2,517 linear feet on Congress Ave, with 28 Water service connections, 29- 8 gate valves and appurtenances; replace 7 fire hydrants and connections 6 DIP, with 7- 6 gate valves. Restore road and driveway course, reestablish turf. The new water service line shall be reconnected to the exiting water meters. Removal or abandonment of existing utilities. 1.1.2 New 8 Water main approximately 1,244 linear feet on Revolution Street, with 15 Water service connections, 13- 8 gate valves and appurtenances, replace 3 fire hydrants and connections 6 DIP, with 7- 6 gate valves. Restore road and driveway course, reestablish turf. The new water service line shall be reconnected to the exiting water meters. Removal or abandonment of existing utilities. 1.1.3 New 8 Water main approximately 1,796 linear feet on Commerce Street, 19 Water service connections, 20- 8 gate valves and appurtenances, replace 4 fire hydrants and connections 6 DIP, with 4- 6 gate valves. Restore road and driveway course, reestablish turf. The new water service line shall be reconnected to the exiting water meters. Removal or abandonment of existing utilities. Final Date to Submit Questions: May 31, 2023 The replacement of approximately 5,557 feet (five thousand five hundred fifty seven feet) of 8" water main as designed by EA Engineering. The Contractor shall remove and/or abandon the existing 4" DIP water main. Range $500,000 to $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Congress Ave - DIP Goettner Construction -$651723 C900 Goettner Construction -$644696 Commerce - DIP Goettner Construction -$952054 C900 Goettner Construction -$938437 Revolution Street- DIP Goettner Construction -$742594 C900 Goettner Construction -$738037

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents