Last Updated | 07/11/2023 03:06 AM |
Project Title | Water Main Replacement Congress Ave, Commerce and Revolution Street(s) |
Physical Address | View project details and contacts |
City, State (County) | Havre de Grace, MD 21078 (Harford County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,667,541 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work under the contract includes: 1.1.1 New 8 Water main approximately 2,517 linear feet on Congress Ave, with 28 Water service connections, 29- 8 gate valves and appurtenances; replace 7 fire hydrants and connections 6 DIP, with 7- 6 gate valves. Restore road and driveway course, reestablish turf. The new water service line shall be reconnected to the exiting water meters. Removal or abandonment of existing utilities. 1.1.2 New 8 Water main approximately 1,244 linear feet on Revolution Street, with 15 Water service connections, 13- 8 gate valves and appurtenances, replace 3 fire hydrants and connections 6 DIP, with 7- 6 gate valves. Restore road and driveway course, reestablish turf. The new water service line shall be reconnected to the exiting water meters. Removal or abandonment of existing utilities. 1.1.3 New 8 Water main approximately 1,796 linear feet on Commerce Street, 19 Water service connections, 20- 8 gate valves and appurtenances, replace 4 fire hydrants and connections 6 DIP, with 4- 6 gate valves. Restore road and driveway course, reestablish turf. The new water service line shall be reconnected to the exiting water meters. Removal or abandonment of existing utilities. Final Date to Submit Questions: May 31, 2023 The replacement of approximately 5,557 feet (five thousand five hundred fifty seven feet) of 8" water main as designed by EA Engineering. The Contractor shall remove and/or abandon the existing 4" DIP water main. Range $500,000 to $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Congress Ave - DIP Goettner Construction -$651723 C900 Goettner Construction -$644696 Commerce - DIP Goettner Construction -$952054 C900 Goettner Construction -$938437 Revolution Street- DIP Goettner Construction -$742594 C900 Goettner Construction -$738037 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |