Similar Projects
Civic Center Generator Replacement and Secured Lot Electrical Upgrades
Renovation
Sub-Bidding
$1,676,710 CJ est. value
Irvine, CA 92606

Exterior Lighting Fixtures
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Irvine, CA 92618

Lighting Improvements Boiler and Sludge dewatering Areas at Plant No 1
Term Contract
Post-Bid
$85,000 est. value
CA

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Senior Center Generator
Term Contract
Results
$170,000 est. value
Brea, CA 92821

Underground District No.67 Sycamore Street
Alteration
Results
$11,000,000 est. value
Anaheim, CA

Regional Traffic Signal Synchronization Program
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Huntington Beach, CA 92648

Arc Flash Analysis and Electrical Safety Program Development
Alteration
Post-Bid
Santa Ana, CA

Cabrillo Park Irrigation Renovation
Renovation, Term Contract, Alteration
Results
$600,000 est. value
Santa Ana, CA

Electric Vehicle Charger Installation at Irvine Civic Center Phase II
Infrastructure
Sub-Bidding
$154,000 CJ est. value
Irvine, CA 92606

Purchase Three - Phase Power Transformer With Load Tap Changer
Alteration
Post-Bid
Anaheim, CA

Electrical Materials Pad Mounted Switches
Alteration
Results
Anaheim, CA

Job Order Contract (JOC) for Low Voltage Systems, Locks and Security Services
Alteration
Post-Bid
Tustin, CA

City Hall New Lighting
Term Contract
Results
Stanton, CA

Job Order Contract (JOC) for Electrical Services
Alteration
Post-Bid
Tustin, CA

Last Updated 07/12/2023 10:06 AM
Project Title

Low Voltage and Network Cabling At The City Maintenance Facility

Physical Address View project details and contacts
City, State (County) Laguna Beach, CA 92651   (Orange County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $52,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 12, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** In general, the work comprises of furnishing all materials, equipment, tools, labor, and incidentals to improve network performance and reliability by upgrading the data cabling at the City Maintenance Facility in the City of Laguna Beach. Type of Award: Lump Sum License Requirements:Class C-7, Low Voltage Systems or C-10, Electrical Liquidated Damages: Five Hundred Dollars $500.00 Start/Delivery Date: Within ten (10) working days after the date of mailing of the Notice to Proceed All work is to be completed in a total of TWENTY-FIVE (25) working days, excluding holidays, from the date specified in the Notice to Proceed, which is anticipated to be September 2023

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents