Similar Projects
SR 145 - Slide Correction
Infrastructure
Conception
$327,000 CJ est. value
Birdseye, IN 47513

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

HRJ Ln/Power Dr Reconstruction Project
Infrastructure
Post-Bid
$1,100,000 CJ est. value
Jasper, IN 47549

Holy Family Streets Improvement Project
Infrastructure
Results
$1,535,311 CJ est. value
Jasper, IN 47546

Holy Family Streets Improvement Project
Infrastructure
Results
$1,535,311 CJ est. value
Jasper, IN 47546

RFP Engineering - Project Development Services
Infrastructure
Pending Verification
$22,846,022 CJ est. value
Saint Anthony, IN 47575

Indoor Regional Wellness Center / Jasper
New Construction, Infrastructure - 22,000 SF
Pending Verification
$37,000,000 CJ est. value
Jasper, IN 47546

Micro-surfacing of Selected Streets
Infrastructure
Post-Bid
$599,000 CJ est. value
Jasper, IN 47546

Orphan Wells - Dubois, Warrick, and Pike Counties
Infrastructure
Results
$2,380,200 CJ est. value
Jasper, IN 47546

Greater Jasper Consolidated Schools - Ruxer Baseball Field and Softball Field
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Jasper, IN 47546

US Highway 231 Sanitary Sewer Relocation for DES
Infrastructure
Results
$135,428 CJ est. value
Huntingburg, IN 47542

Construction of Improvements to Portions of County Road
Infrastructure
Results
$532,637 CJ est. value
Jasper, IN 47546

Division I - 750,000 Gallon Elevated Water Storage Tank
Infrastructure
Results
$2,074,400 CJ est. value
Dubois, IN 47527

Sanitary Sewer Main Relocation
Infrastructure
Results
$267,212 CJ est. value
Birdseye, IN 47513

Last Updated 09/18/2023 04:31 AM
Project Title

Wastewater Collection Facilities, Wabash Valley Produce Sewer Improvements

Physical Address View project details and contacts
City, State (County) Dubois, IN 47527   (Dubois County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,375,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given, that the Patoka Lake Regional Water and Sewer District, hereinafter referred to as the Owner, will receive sealed bid packets for the construction of their Wastewater Collection Facilities, Wabash Valley Produce Sewer Improvements. The Bids must be submitted on the Bid Forms provided and in accordance with the bidding documents prepared by Midwestern Engineers, Inc., Loogootee, Indiana. Plans and Specifications for the Project are on file and may be examined at the following locations: o Midwestern Engineers, Inc., 802 West Broadway Street, Loogootee, IN 47553 o P a t o k a L a k e Requests for plans and specifications sent to the office of Midwestern Engineers, Inc., for a paper bound set, shall be accompanied by a check or money order. All service charges for viewing are non-refundable. Representatives of the Owner and Engineer will be present to discuss the project. The work to be performed and the bid to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder. All bids must be submitted on the bid forms as identified in the Contract Documents and Specifications. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification. Bidders bond must include a certified copy of the power of attorney. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. Bid security of the three lowest Bidders will be retained until the Contract has been awarded and executed, but no longer than ninety (90) days from the date of opening Bids. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents