Similar Projects
SCUBA Diving Facility
New Construction - 7,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fort Mill, SC

Southeastern Mixed Use Project
New Construction
Design
Bluffton, SC

Restroom Partitions
Post-Bid
Florence, SC

Grande Dunes North Clubhouse & Pool House
New Construction - 6,730 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Myrtle Beach, SC

New Toilet Facility at Sergeant Jasper County Park
Results
Hardeeville, SC

James Island County Park Primitive Campground Restroom Replacement
New Construction
Results
Charleston, SC 29412

DORA Market Pavilion
New Construction - 6,300 SF
Construction
$450,000 to $600,000 est. value
Orangeburg, SC

Omni Hotel Beach Bar and Bath House
New Construction
Construction
$560,000 est. value
Hilton Head Island, SC 29915

The Landings at Grande Dunes
New Construction
Design
Myrtle Beach, SC

Palmer Street Public Restrooms Project
Post-Bid
Ridgeway, SC

Arsenal Construction - Windows and Bathrooms
Renovation
Results
Beaufort, SC 29902

Sunset Pavilion
New Construction - 2,150 SF
Construction
$335,822 est. value
Hilton Head Island, SC 29928

Shadowmoss Pool House
New Construction
Design
Charleston, SC

2019 Silver Bluff High Football Stadium Restrooms
Post-Bid
Aiken, SC 29803

Rosebrock Park Project - Restrooms, Storage Area, Septic System
Results
Summerville, SC

Last Updated 10/25/2019 12:57 PM
Project Title

Residential Bathroom Addition

Physical Address View project details and contacts
City, State (County) West Columbia, SC 29170   (Lexington County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Purpose of turning an existing space of a Consumer's home into a fully functioning bathroom. Drawing and pictures of the space to be remodeled are located in the attachments. We are looking for a contractor to provide demolition, materials and construction for bathroom remodel, provide and install accessible shower system, provide and install bathroom vanity sink and fixtures, provide and install ADA-height commode, provide and install grab bars, provide all necessary plumbing and electrical work to be completed by licensed contractor(s).
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents