Similar Projects
Traffic Management System Installation
Infrastructure
Conception
$800,000 CJ est. value
Tower, MN 55790

Patricia Zakovec Impoundment Water Control Structure
Renovation, Infrastructure
Design
$170,980 CJ est. value
Toivola, MN 55765

Clure Public Marine Terminal - Duluth Seaway Port Authority
Infrastructure
Design
$10,500,000 CJ est. value
Duluth, MN 55802

King Road Lift Station - Rebid
Renovation, Infrastructure
Bidding
$520,000 CJ est. value
Orr, MN 55771

Drainage Improvements, Duluth National Guard
Infrastructure
Bidding
$200,000 CJ est. value
Duluth, MN 55811

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Scientific Drilling Operations
Infrastructure
Post-Bid
Soudan, MN 55782

Woodland Park and Ride Refurbishment
Results
$90,000 est. value
Duluth, MN 55803

Grading, Bituminous Surfacing, Utilities and ADA Improvements
Results
MN

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

E 4th St. Apartment Building
Renovation, Infrastructure
Pending Verification
Less than $1,100,000 est. value
Duluth, MN 55805

Salvation Army - Virginia
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Virginia, MN 55792

Scientific Drilling Operations for 2022
Infrastructure
Post-Bid
Soudan, MN 55782

Burntside Lake-Sandemar Public Water Access Parking/Access Upgrade
Results
$416,880 est. value
Ely, MN

333 Tower Mixed-Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$75,000,000 CJ est. value
Duluth, MN 55802

Last Updated 08/31/2022 06:32 AM
Project Title

REBID Full-Scale ISCO Remediation Former Crane Lake Resort

Physical Address View project details and contacts
City, State (County) Crane Lake, MN 55725   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $97,535 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is Targeted Group/Economically Disadvantaged/Veteran-Owned (TG/ED/VO) certified small business preference. A. The work will done under one prime contract that includes: General, Electrical, and Mechanical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) The project requires an experienced team of contractors to complete full-scale In-Situ Chemical Oxidation (ISCO) remediation at the former Crane Lake Resort (LS0018150). 2.) Remediation including light nonaqueous phase liquid (LNAPL) recovery as appropriate and ISCO has been selected by the MPCA to address the residual petroleum impacts at the Site which will in turn reduce potential contamination risk to adjacent Crane Lake and Camp Forty Creek. 3.) The goal of the work is for groundwater throughout the Site to meet MPCA cleanup criteria as described in the specification nine (9) months after the final on-site injection activity. The Section 00 41 73 Prime Contractor Response Form, which includes the attachments listed in the project manual table of contents, is posted within the VirtuBid area of the QuestCDN Plan Room. The Response Form must be downloaded, completed, and uploaded with the bid before it can be posted. Note: Responders to this solicitation must comply with the Responsible Contractor Law. Compliance includes having a valid certificate of authority to transact business in Minnesota with the secretary of state if a foreign corporation or cooperative at the time of submitting a response to this solicitation. A mandatory pre-bid meeting will be held for this solicitation. Note, Prime Contractors that attended the pre-bid meetings held on July 13, 2022 and August 9, 2022 for the initial and rebid solicitations are not required to attend this pre-bid meeting. Pre-registration is required to attend the pre-bid meeting and the date of the pre-bid meeting will be established after the pre-registration deadline. To pre-register for the pre-bid meeting email Brad Ullery at Bullery@Braunintertec.com no later than August 23, 2022 at 1:00 PM CT. Responses received from contractors that did not attend this pre-bid meeting or the pre-bid meetings on July 13, 2022 or August 9, 2022 will be rejected.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents